search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
  1. Home
  2. Current Affairs
120 new news items in the last 24 hours
21 July 14:30

Hidroelectrica has signed a 39.25 million lei contract for the floating system "Nufărul", which will produce solar energy in Olt County.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
Current Affairs
sursa foto: facebook.com/ Portul Constanța
Hidroelectrica has signed a contract worth almost 40 million lei for the realization of its first floating photovoltaic panel system, called "Nufărul", in Olt County. The project, won by Waldevar Energy, will include the installation of bifacial photovoltaic panels and will have a total capacity of 10 MW, generating about 13.4 GWh/year. The aim is to diversify renewable energy production and harness the potential of reservoirs. The project is considered an important step in the integration of hydropower and solar energy in Romania.

Sources

sursa imagine
Economedia
Hidroelectrica a semnat contractul de aproape 40 de milioane de lei pentru realizarea primului sistem flotant de panouri fotovoltaice al companiei, în Olt. Waldevar preia proiectul
sursa imagine
Profit.ro
PREMIERĂ Hidroelectrica lansează „Nufărul”
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hidroelectrica Water Lily I photovoltaic panels solar energy

Editor’s Recommendations

main event image Play button
6 hours before
Podcast

Podcast "Informed People": University lecturer prof. Costin Ciora, about how the prices are set

main event image
Economy
9 hours before

Romania's GDP recorded a growth of 0.3% in the second quarter of 2025 compared to the second quarter of 2024, according to INS data.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol