search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
154 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Hidroelectrica has signed a 39.25 million lei contract for the floating system "Nufărul", which will produce solar energy in Olt County.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
21 July 2025, 14:30
main event image
Current Affairs
sursa foto: facebook.com/ Portul Constanța
google-preference

Always see our news on Google

Hidroelectrica has signed a contract worth almost 40 million lei for the realization of its first floating photovoltaic panel system, called "Nufărul", in Olt County. The project, won by Waldevar Energy, will include the installation of bifacial photovoltaic panels and will have a total capacity of 10 MW, generating about 13.4 GWh/year. The aim is to diversify renewable energy production and harness the potential of reservoirs. The project is considered an important step in the integration of hydropower and solar energy in Romania.

Sources

sursa imagine
Economedia
Hidroelectrica a semnat contractul de aproape 40 de milioane de lei pentru realizarea primului sistem flotant de panouri fotovoltaice al companiei, în Olt. Waldevar preia proiectul
sursa imagine
Profit.ro
PREMIERĂ Hidroelectrica lansează „Nufărul”

Latest News

23:05

The Trump administration will ban imports of humanoid robots and electric inverters from China

22:59

The Tate brothers are requesting bail in the USA, and the decision will be made in August.

22:44

Romania has obtained a tranche of 800 million euros from the PNRR for the modernization of heating systems. The bill has passed through committees, providing funding solutions.

22:28

PSD criticizes the Bolojan Government after the approval of the Memorandum for unblocking positions in the healthcare system: "Suddenly, the Government found the necessary funds"

22:20

The passengers of the cruise ship stranded on the Danube due to drought have been evacuated.

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Hidroelectrica has signed the contract for the construction of the Tudor Vladimirescu Photovoltaic Power Plant, in Braila County
event image
Economy
Electrica has signed an EPC contract with Foton Power Energy S.R.L. for the photovoltaic project 'Bihor 1', which includes a capacity of 78.8 MWp and a 110 kV transformer station.
event image
Current Affairs
The Austrian company Enery has started the construction of a hybrid photovoltaic park in Ogrezeni, Giurgiu, with an investment of 460 million euros.
event image
Current Affairs
Romania recorded on Wednesday the highest electricity production from photovoltaic sources, exceeding 2,500 MW and covering 60% of national consumption.
event image
Economy
Hidroelectrica made investments of 90 million lei in the first three months of 2026, 72% more than last year, but below 9% of the annual budget
event image
Economy
Enevo Group and Kraftfeld are building a 220 MWh energy storage system in Drăgănești-Olt
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hidroelectrica Water Lily I photovoltaic panels solar energy

Editor’s Recommendations

main event image
Current Affairs
4 hours ago

The government has approved the Memorandum for filling approximately 6,900 vacant positions in hospitals and ambulance services.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol