search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
134 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Work at the Vidraru dam: Components installed with the help of a helicopter. The lake refilling begins at the end of March.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
5 March 2026, 12:04
main event image
Current Affairs
Credit: Giulio Andreini/UCG/Universal Images Group / Universal images group / Profimedia
google-preference

Always see our news on Google

At the Vidraru dam, the modernization works within the Vidraru Hydroelectric Project continue, and the installation of some essential components is being carried out with the help of a helicopter, due to the difficult access in the area of the water intake. The operation is part of a strict technological interval, correlated with the draining and refilling of the reservoir.


The refilling of the Vidraru lake is scheduled to begin at the end of March, after the completion of the works on the hydromechanical installations, and the authorities and Hidroelectrica hope that by autumn the lake will reach the minimum technical level necessary to restart at least one hydro unit and resume electricity production and water supply to the downstream localities.

Sources

sursa imagine
Economedia
VIDEO Lucrări efectuate cu ajutorul unui elicopter la Barajul Vidraru / Reumplerea lacului Vidraru va începe la finele lunii martie
sursa imagine
Libertatea
Când se reumple lacul Vidraru: a fost adus inclusiv un elicopter la baraj
sursa imagine
Romania TV
Lucrări spectaculoase la barajul Vidraru, a fost mobilizat inclusiv un elicopter. Când se va umple din nou lacul
sursa imagine
Economica
VIDEO Ce se întâmplă acum la Barajul Vidraru. A fost adus inclusiv un elicopter

Latest News

23:52

Ilie Bolojan announces that the PNL and USR have finalized the proposal to reduce the number of parliamentarians: “Now we no longer have any constraints”

23:34

Donald Trump asks Nvidia to give Jensen Huang a “second chance”

23:17

ECB reorganizes its leadership in 2027 / Spain is expected to take over the institution’s presidency, while France and Germany propose candidates for key positions

22:59

Ilie Bolojan criticizes the administrative reorganization of the Government formed mostly of PSD members: “There is nothing serious”

22:43

A delivery driver from Sri Lanka attacked in Iași County. The attacker destroyed his scooter and phone

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Hidroelectrica is preparing the approval of the construction of a floating photovoltaic panel system on the Olt River, an investment of 1.4 billion lei
event image
Current Affairs
The Cernavodă reactors could be restarted only toward the end of September
event image
Current Affairs
The Ministry of Environment has issued the environmental permit for the completion of works at the Cornetu-Avrig hydroelectric power plant / The investment is estimated to produce 156.8 GWh annually
event image
Current Affairs
Cernavodă power plant remains shut down / Low Danube water flow delays reactor restart
event image
Current Affairs
Nuclearelectrica begins restarting Unit 1 at Cernavodă / Reactor could be resynchronized on Friday
event image
Current Affairs
Three dredging machines are intervening in the Cernavodă area to reshape the Danube riverbed and redirect the flow towards the nuclear power plant.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Hidroelectrica retehnologizare Vidraru Dam advance

Editor’s Recommendations

main event image
Current Affairs
Yesterday 19:21

EUROCONTROL blocks the sums owed to ROMATSA again / The garnishment was imposed at Pfizer’s request in the dispute concerning COVID-19 vaccines

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
Yesterday 08:41

EXCLUSIVE | Romania, as viewed by the Russian press / The scenario of unification with the Republic of Moldova, described as a “capitulation” of Chișinău

main event image
Opinions
Yesterday 13:59

Andrei Cornea: Politics, Ethics and Fanaticism

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol