search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
139 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNAIR has appointed the Turkish constructor NUROL INSAAT for Lot 3 of the Arad - Oradea DEx, with a contract worth 2.85 billion lei.

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
30 July 2025, 12:12
main event image
Current Affairs
foto:shutterstock
google-preference

Always see our news on Google

Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.

Sources

sursa imagine
Mediafax
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
sursa imagine
Economedia
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
sursa imagine
News.ro
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA

Latest News

22:58

The Oradea City Hall will turn on the public lighting an hour later to reduce energy consumption.

22:42

Volodymyr Zelensky dismissed Olha Stefanișena from the position of ambassador to the USA, in the context of allegations of embezzlement.

22:30

Switzerland: An outbreak of legionellosis in Basel has led to 26 cases / Authorities suspect cooling towers as the source of contamination

22:18

Unit 2 of the Cernavodă Nuclear Power Plant can operate for only five days due to the decrease in the Danube's water level.

21:57

At Mița, the cyclist turns off the architectural lighting of the facade to reduce energy consumption.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The construction of the Oradea - Arad Expressway could begin this summer, after the project was taken over by CNIR.
event image
Current Affairs
CNIR signed a contract with FCC Construccion for section 3 Lețcani - DN 24 of the A8 Highway, worth 3.93 billion lei
event image
Current Affairs
CNIR expropriates 106 properties for the A3-DN 1P road junction in Bihor
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
Lot 4 Pantelimon – Glina of the A0 North highway is almost completed, but it cannot be opened to traffic.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR construction works Lot 3 arad Oradea

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

Grozăvești CET resumes electricity production, providing 30 MW for the stabilization of the National Energy System.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
main event image
International
1 hour ago

Donald Trump stated that the naval blockade of the USA against Iran will only be lifted in the case of an agreement or a total capitulation of Tehran.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Exclusive
9 hours ago

SPECIAL Informat.ro / The top international political topics of the last week. Effects on Romania

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol