search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
143 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNAIR has appointed the Turkish constructor NUROL INSAAT for Lot 3 of the Arad - Oradea DEx, with a contract worth 2.85 billion lei.

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
30 July 2025, 12:12
main event image
Current Affairs
foto:shutterstock
google-preference

Always see our news on Google

Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.

Sources

sursa imagine
Mediafax
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
sursa imagine
Economedia
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
sursa imagine
News.ro
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA

Latest News

16:04

Jörg Fegert calls on providers to demonstrate that digital services are safe before gaining access to minors

15:55

E-commerce platforms are expected to assume customs responsibility for imports sold to consumers in the EU

15:51

NGOs call for EU support for LGBTI+ organizations in Turkey following detentions and website blocks

15:48

Two men were injured after gas accumulated in a smokehouse in Misentea, Harghita County

15:42

China imposes travel restrictions on its citizens

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNIR expropriates 106 properties for the A3-DN 1P road junction in Bihor
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
Lot 4 Pantelimon – Glina of the A0 North highway is almost completed, but it cannot be opened to traffic.
event image
Current Affairs
On the Transylvania Highway A3, in Bihor, a 3-kilometer section will be configured as a runway for aircraft in emergency situations.
event image
Current Affairs
The CNIR issued the Expropriation Decision for the properties along the Focșani-Brăila Express Road route, affecting 3,297 properties and an area of 8,557,483 square meters.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR construction works Lot 3 arad Oradea

Editor’s Recommendations

main event image
Current Affairs
2 hours ago

Victoria Passage, blocked by the farmers’ protest in front of the Government / Bucharest Gendarmerie speaks of “infiltrated persons”

main event image
Exclusive
3 hours ago

ANALYSIS Why are farmers protesting and how does "herd health" come into conflict with the ideology of free trade

main event image
Current Affairs
2 hours ago

Valeriu Iftime, questioned at the Iași DNA in Fănel Bogos's case. The head of the Botoșani County Council says he is not involved in the investigation

Sources
imagine sursa
imagine sursa
main event image
Sport
3 hours ago

The 2028 Europa League final in Bucharest at the National Arena!

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol