Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.
Sources
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA
Latest News
08:49
Ro-Alert message in Tulcea: The Ministry of Defense detected drones near the border with Ukraine / Two F-16 aircraft were scrambled
08:42
The Court of Accounts uncovered incorrect recalculations, pensions paid after death, and unlawfully granted bonuses in the public system
08:26
Donald Trump announces an energy ceasefire between Ukraine and Russia / Kyiv says it knows nothing about the agreement
08:07
The U.S. Supreme Court blocks Trump's plan regarding mail-in voting
07:57
Unauthorized protest by farmers in Victory Square: They are prepared to stay several days in the capital and say they are not afraid of fines / Their demands
See more news