search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
50 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNAIR has appointed the Turkish constructor NUROL INSAAT for Lot 3 of the Arad - Oradea DEx, with a contract worth 2.85 billion lei.

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
30 July 2025, 12:12
main event image
Current Affairs
foto:shutterstock
google-preference

Always see our news on Google

Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.

Sources

sursa imagine
Mediafax
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
sursa imagine
Economedia
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
sursa imagine
News.ro
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA

Latest News

10:22

August 3, 2026. TV: What was discussed last night on the news channels

10:16

Ciprian Ciucu: The Capital City Hall is facing major financial problems.

10:09

The Pârjoaia cliff has been detonated. How the military managed to destroy it after a first failed attempt.

10:06

Bucharest hosts the annual NATO military reservists congress.

09:47

The first official report from Morocco after the migration crisis in Ceuta: 11 migrants died on the Moroccan side of the border / Spain recorded 72 deaths

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The construction of the Oradea - Arad Expressway could begin this summer, after the project was taken over by CNIR.
event image
Current Affairs
CNIR signed a contract with FCC Construccion for section 3 Lețcani - DN 24 of the A8 Highway, worth 3.93 billion lei
event image
Current Affairs
CNIR expropriates 106 properties for the A3-DN 1P road junction in Bihor
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
Lot 4 Pantelimon – Glina of the A0 North highway is almost completed, but it cannot be opened to traffic.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR construction works Lot 3 arad Oradea

Editor’s Recommendations

main event image
Politics
1 hour ago

Emergency meeting at the Ministry of Energy. Major industrial consumers convened to discuss voluntary reduction of electricity consumption.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
13 minutes ago

The Pârjoaia cliff has been detonated. How the military managed to destroy it after a first failed attempt.

Sources
imagine sursa
imagine sursa
main event image
International
42 minutes ago

Donald Trump announces the resumption of negotiations with Iran, after postponing an attack against the Islamic Republic.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Opinions
1 hour ago
Editorials and opinions

Who will write the next chapter of the European economy?

main event image
Opinions
Yesterday 17:36
Editorials and opinions

Aș propose that we no longer be surprised...

main event image
Exclusive
1 hour ago
Original Content

EXCLUSIVE | August 3, 2026. Trends in online searches / last 24 hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol