search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
  1. Home
  2. Current Affairs
171 new news items in the last 24 hours
30 July 12:12

CNAIR has appointed the Turkish constructor NUROL INSAAT for Lot 3 of the Arad - Oradea DEx, with a contract worth 2.85 billion lei.

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
Current Affairs
foto:shutterstock
Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.

Sources

sursa imagine
Mediafax
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
sursa imagine
Economedia
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
sursa imagine
News.ro
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA

ȘTIRI PE ACELEAȘI SUBIECTE

event image
Current Affairs
The works on section 3 of the Ploiești-Buzău Highway have reached 81%, and the opening of traffic is scheduled for the end of 2025.
event image
Current Affairs
The works on the A3 Highway, Zimbor - Poarta Sălajului section, are at an advanced stage, but financial uncertainties jeopardize the completion deadline.
event image
Current Affairs
The National Company CFR SA has signed a contract with PORR Construct SRL for the design and execution of works on lot 5 Băile Herculane-Poarta, part of the rehabilitation of the railway line Craiova – Drobeta Turnu Severin – Caransebeș.
event image
Current Affairs
Works on section 4 Tigveni - Curtea de Argeș have reached 77%, with a focus on the Momaia tunnel, the first structure of its kind on a highway in Romania.
event image
Current Affairs
CNAIR announces a progress of 57% on the Suplacu de Barcău – Chiribiș section of the Transylvania highway, with 540 workers and 305 active machines.
event image
Current Affairs
Porr Construct SRL has started the asphalting on lot 4 of the Sibiu – Pitești Highway, with a physical progress of almost 80%, possibility of early completion.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR construction works Lot 3 arad Oradea

Informat Moldova

main event image
Republic of Moldova
49 minutes before

Moldova: The Constitutional Court will examine on October 16 the validation of the election and the mandates of the elected deputies.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa

Editor’s Recommendations

main event image
Politics
1 hour before

A new decisive day at the Constitutional Court for the Bolojan Government. The Constitutional Court is expected to decide on Wednesday regarding the laws in the package of 2 measures aimed at reducing the deficit, for which the Government has assumed responsibility in Parliament.

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol