Cristian Pistol, director of CNAIR, announced that Lot 3 of the Arad - Oradea Express Road, 47 km long, will be built by NUROL INSAAT VE TICARET A.S. The contract, worth 2.85 billion lei, is financed by the Transport Program 2021-2027. The works will last 24 months and will include 29 structures, including a 592 m long overpass. DEx Arad - Oradea will have a total length of 120.47 km, divided into 3 lots.
Sources
CNAIR: A fost desemnat constructorul pentru lotul 3 al drumului expres Arad-Oradea
Drumul Expres Arad - Oradea. CNAIR îi desemnează pe turcii de la Nurol câștigători pentru construcția Lotului 3, după contestații
Lotul 3, de 47 km, al drumului expres Arad - Oradea va fi realizat de un constructor turc. Valoarea contractului, 2,85 miliarde lei, fără TVA
Latest News
09:48
Three suspects were arrested after the armed attack on an Orthodox church in Jordan, which left nine people dead
09:42
Serbia: Who is the Students’ List party, the party that managed to remove Aleksandar Vucic from power
09:36
Grok, Elon Musk's AI, has released the first episode of "Odyssey"
09:26
The PSD leadership is meeting today to analyze the Government's measures and the replacement of the prefects
09:01
EXCLUSIVE | October 26, 2026. Online search trends / last 24 hours
See more news