search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
72 new news items in the last 24 hours
  1. Home
  2. International

CNAIR announces that Lot 2 of the Arad-Oradea Express Road will be built by a Romanian-Turkish joint venture, including a connecting road to Hungary.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
4 August 2025, 14:24
main event image
Current Affairs
sursa foto: facebook.com/ Cristian Pistol
google-preference

Always see our news on Google

Ciprian Pistol, director of CNAIR, has announced the signing of the contract for Lot 2 of the Arad-Oradea Express Road, which will be realized by a Romanian-Turkish joint venture, worth 2.76 billion lei. The project includes 39.7 km of road and a 10 km connecting road with Hungary. Funded by the Transport Program 2021-2027, the completion deadline is 24 months. The road will improve mobility in western Romania and connect the region with European corridors.

Sources

sursa imagine
Stiripesurse
Se construiește Drumul Expres care leagă România de Occident: Va ajunge inclusiv pe teritoriul Ungariei
sursa imagine
Mediafax
O asociere româno-turcă va construi lotul 2 al drumului expres Arad-Oradea
sursa imagine
psnews.ro
S-a decis! O asociere româno-turcă va construi lotul 2 al drumului expres Arad-Oradea

Latest News

12:40

Italy: Accident in the province of Rieti, Umbria / Six people have died, and another 26 have been injured in a collision between a bus, a trailer, and two cars.

12:37

Australia has reported the first case of mass mortality of wild animals due to the H5 avian influenza.

12:37

The Danube's flow is alarmingly decreasing, Romania declares a national state of alert.

12:34

A vulnerability in Coldcard software has led to the theft of up to 89 million dollars in Bitcoin from over 1,200 digital wallets. Users are warned to take urgent measures.

12:34

The National Trade Union Confederation Cartel ALFA requests the Parliament and the Government to urgently intervene in the issues of the energy system and asks the DNA and DIICOT to analyze the closure of coal production capacities.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The construction of the Oradea - Arad Expressway could begin this summer, after the project was taken over by CNIR.
event image
Current Affairs
CNIR has handed over the site of lot 2B Grințieș-Pipirig of the A8 Highway to the contractor UMB. The works will include 16 tunnels and 60 bridges.
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
Ilie Bolojan announced the signing of the SAFE contract for section 4 of the "Union" A8 Highway, which will connect Romania to the Republic of Moldova.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
CNIR signed a contract with FCC Construccion for section 3 Lețcani - DN 24 of the A8 Highway, worth 3.93 billion lei
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
express road Arad-Oradea contract Hungary

Editor’s Recommendations

main event image
Politics
4 hours ago

Emergency meeting at the Ministry of Energy. Major industrial consumers convened to discuss voluntary reduction of electricity consumption.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
2 hours ago

The Pârjoaia cliff has been detonated. How the military managed to destroy it after a first failed attempt.

Sources
imagine sursa
imagine sursa
main event image
International
3 hours ago

Donald Trump announces the resumption of negotiations with Iran, after postponing an attack against the Islamic Republic.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
main event image
Opinions
3 hours ago
Editorials and opinions

Who will write the next chapter of the European economy?

main event image
Opinions
Yesterday 17:36
Editorials and opinions

Aș propose that we no longer be surprised...

main event image
Exclusive
4 hours ago
Original Content

EXCLUSIVE | August 3, 2026. Trends in online searches / last 24 hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol