CNAIR recently signed the contract for the construction of lot 3 of the Arad-Oradea Express Road, a project considered essential for the development of road infrastructure in Romania. The Minister of Transport emphasized the importance of these investments in the context of revitalizing the national economy. The project is part of a series of initiatives aimed at improving the transport network and facilitating mobility, thus contributing to economic growth. The construction of this lot will bring significant benefits to the region, including reduced travel time and improved road safety.
Sources
Ministrul Transporturilor: CNAIR a semnat contractul pentru construcţia lotului 3 al Drumului Expres Arad-Oradea
Directorul CNAIR a anunţat construcţia unui nou drum expres, de 120,47 km, în România: E parte din coridorul european strategic
All 120 km of the Arad – Oradea Expressway, covered by contracts
Drumul Expres Arad – Oradea: A fost semnat contractul pentru ultimul lot, cu turcii de la Nurol
Latest News
19:15
UEFA has initiated legal proceedings to open a criminal case against FIFA and president Gianni Infantino
19:05
ANPC warns about the phenomenon of "shrinkflation" / Consumers are urged to check the net quantity and the price per kilogram or liter
18:48
Man died after drowning in the sea, at Eforie Nord. He ignored the red flag and was rescued from the water by lifeguards three times.
18:30
Nicușor Dan and Maia Sandu discussed in Chișinău about European integration and energy security
18:18
Ilie Bolojan: Over 2,000 PNRR projects received in August / Unfinished works will be paid for by local authorities
See more news