search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
78 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNAIR has signed the contract for the construction of lot 3 of the Arad-Oradea Express Road

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
29 January 2026, 15:01
main event image
Current Affairs
Foto: Cristian Pistol / Facebook
google-preference

Always see our news on Google

CNAIR recently signed the contract for the construction of lot 3 of the Arad-Oradea Express Road, a project considered essential for the development of road infrastructure in Romania. The Minister of Transport emphasized the importance of these investments in the context of revitalizing the national economy. The project is part of a series of initiatives aimed at improving the transport network and facilitating mobility, thus contributing to economic growth. The construction of this lot will bring significant benefits to the region, including reduced travel time and improved road safety.

Sources

sursa imagine
Capital
Ministrul Transporturilor: CNAIR a semnat contractul pentru construcţia lotului 3 al Drumului Expres Arad-Oradea
sursa imagine
Antena3
Directorul CNAIR a anunţat construcţia unui nou drum expres, de 120,47 km, în România: E parte din coridorul european strategic
sursa imagine
Mediafax
All 120 km of the Arad – Oradea Expressway, covered by contracts
sursa imagine
Economica
Drumul Expres Arad – Oradea: A fost semnat contractul pentru ultimul lot, cu turcii de la Nurol

Latest News

23:03

MFA warns Romanians: Belgium’s national strike suspends nearly all flights

22:45

Valeriu Stoica: “Administrative-territorial reform is more than a trial by fire”

22:35

Ilie Bolojan: “Romania has more state employees than it can afford”

22:20

Explosion aboard a Russian ship in the Libyan port of Benghazi

22:02

Iran announces missile and drone attacks on U.S. bases in Bahrain

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNIR announces that work on the Chiribiș-Biharia section of the A3 has reached 87% and is progressing ahead of schedule
event image
Current Affairs
Pro Infrastructure Association: The Nădășelu-Zimbor section of the Transylvania Motorway could be opened to traffic around December 15
event image
Current Affairs
Radu Miruță signed the financing for the first section of the Craiova–Târgu Jiu expressway
event image
Current Affairs
CNAIR announces that traffic on 13 kilometers of A0 North could open by the end of the month
event image
Current Affairs
The Bucharest Court of Appeal annulled the awarding of lots 1 and 2 of the Suceava–Siret Expressway and ordered CNAIR to reevaluate the bids
event image
Current Affairs
CNAIR: The Suplacu de Barcău–Chiribiș section of the A3 motorway could be opened to traffic by the end of 2026
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR Lot 3 arad Oradea express road reconstruction start construction

Editor’s Recommendations

main event image
Opinions
21 November 2026, 19:08

Sever Voinescu: The Misadventures of a Press Conference

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol