CNAIR recently signed the contract for the construction of lot 3 of the Arad-Oradea Express Road, a project considered essential for the development of road infrastructure in Romania. The Minister of Transport emphasized the importance of these investments in the context of revitalizing the national economy. The project is part of a series of initiatives aimed at improving the transport network and facilitating mobility, thus contributing to economic growth. The construction of this lot will bring significant benefits to the region, including reduced travel time and improved road safety.
Sources
Ministrul Transporturilor: CNAIR a semnat contractul pentru construcţia lotului 3 al Drumului Expres Arad-Oradea
Directorul CNAIR a anunţat construcţia unui nou drum expres, de 120,47 km, în România: E parte din coridorul european strategic
All 120 km of the Arad – Oradea Expressway, covered by contracts
Drumul Expres Arad – Oradea: A fost semnat contractul pentru ultimul lot, cu turcii de la Nurol
Latest News
09:26
Iran accuses the USA of "economic terrorism". Abbas Araghchi calls on the UN to reject American coercive measures.
09:22
EXCLUSIVE | August 27, 2026. Trends in online searches / last 24 hours
09:03
CIA Director, John Ratcliffe, went to Moscow to deter Russia from attacking NATO (press)
09:01
US Open 2026! Karolina Muchova and Jakub Mensik have won the title in the mixed doubles event.
08:57
A small aircraft crashed in Alaska, causing the death of the four people on board.
See more news