search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
50 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The National Company Bucharest Airports is building a photovoltaic power plant of 31.5 MWp for Otopeni Airport, with a value of 283.7 million lei

Matei Gaginsky
whatsapp
facebook
linkedin
x
copy-link copy-link
23 December 2025, 13:28
main event image
Current Affairs
Foto: Shutterstock.com
google-preference

Always see our news on Google

The National Company Bucharest Airports (CNAB) has launched a project to build a photovoltaic power plant with a total capacity of 31.5 MWp, intended for the self-consumption of Henri Coandă International Airport Bucharest. The project, valued at 283,765,450 lei (excluding VAT), includes a 30 MWh energy storage system and is part of a broader process of modernizing airport infrastructure. The first phase of the project involves the construction of a plant with a capacity of 12.6 MWp and a storage system of 17.88 MWh, for which CNAB has obtained non-reimbursable funding of 132,044,800 lei.


This initiative aims to increase energy autonomy, reduce operational costs, and diminish environmental impact, thus aligning with international sustainability standards. The airport recently obtained Level 3 accreditation under the Airport Carbon Accreditation program, recognizing its efforts in managing CO₂ emissions.

Sources

sursa imagine
Mediafax
Aeroportul Otopeni implementează un proiect prin care să își producă propria energie electrică
sursa imagine
News.ro
Aeroportul Otopeni îşi construieşte o centrală fotovoltaică de 31,5 MWp, integrată cu un sistem de stocare a energiei de 30 MWh. Investiţia este de 283,76 milioane lei fără TVA
sursa imagine
Economedia
Aeroportul Otopeni va avea propria centrală fotovoltaică, susținută de un sistem de stocare a energiei
sursa imagine
Stiripesurse
Aeroportul Otopeni face pasul decisiv spre independență energetică: Aeroportul își va produce propria energie

Latest News

22:59

The Pentagon is asking the American defense industry to rapidly increase the production and delivery of weapons.

22:45

CNAS reveals fraud in the healthcare system: Fake consultations for vulnerable patients: "They forgot to ask if the patients are still alive"

22:38

A WHO medical supplies depot in Dnipro, Ukraine, was attacked and destroyed.

22:29

The police in Botoșani discovered a body buried in the yard of a house belonging to a man who went missing in April. His partner has been arrested for qualified murder.

22:05

Elon Musk refuses the use of Starlink by Ukraine for attacks in Russia

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNAB has announced an open tender for the maintenance of baggage processing systems and access at Băneasa Airport, with a value of 7.25 million lei
event image
Current Affairs
CNAB announces a tender for a contract of 1.9 million euros for the maintenance of security equipment, with a deadline for submitting offers on July 13, 2026.
event image
Economy
Electrica has signed an EPC contract with Foton Power Energy S.R.L. for the photovoltaic project 'Bihor 1', which includes a capacity of 78.8 MWp and a 110 kV transformer station.
event image
Economy
Hidroelectrica has signed the contract for the construction of the Tudor Vladimirescu Photovoltaic Power Plant, in Braila County
event image
Current Affairs
The Austrian company Enery has started the construction of a hybrid photovoltaic park in Ogrezeni, Giurgiu, with an investment of 460 million euros.
event image
Current Affairs
Auction of 1.9 million euros for the maintenance of explosive detection systems at Henri Coandă International Airport
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Otopeni Airport photovoltaic power plant build

Editor’s Recommendations

main event image
Current Affairs
Yesterday 17:58

Irinel Scrioșteanu, after the sinking of the barges in the Danube: A hard-fought battle, good result, but the danger has not passed [...] the currents of the Danube are strong and can be very unpredictable.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+5
main event image
Opinions
8 August 2026, 18:08

Andrei Cornea: "The many" and their detested experts

main event image
Exclusive
8 August 2026, 09:25
Original Content

IT News Review by Control F5 Software: EU considers it necessary to monitor high-risk AI systems

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol