search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
88 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The capital's City Hall will replace 12.95 km of district heating pipes with grant funding to improve energy efficiency.

Gabriel Dumitrache
whatsapp
facebook
linkedin
x
copy-link copy-link
26 June 2025, 09:59
main event image
Current Affairs
Inquam Photos / Malina Norocea
google-preference

Always see our news on Google

Acting Mayor Stelian Bujduveanu has announced that the City Hall of Bucharest will modernize the district heating system by replacing 12.95 km of pipes, benefiting from a non-reimbursable financing of 85% from the Ministry of Development. The works will affect areas such as Calea Vitan and Șoseaua Mihai Bravu and are designed to reduce breakdowns, energy losses and improve the quality of service. The project is part of the strategy to modernize Bucharest's district heating system, helping to reduce pollution and operating costs.

Sources

sursa imagine
Stirile ProTV
Primăria Capitalei anunță că vor fi înlocuiți aproape 13 km de conducte de termoficare. Zonele vizate de lucrări
sursa imagine
News.ro
Primarul interimar al Capitalei anunţă că programul de modernizare a sistemului de termoficare include refacerea a 12,95 kilometri de conducte magistrale/ Lucrările vor asigura agent termic în parametri optimi locuitorilor din mai multe cartiere FOTO
sursa imagine
B365
Noi șantiere termo se vor deschide în București, anunță Bujduveanu. Buget pentru schimbat țevi pe Șoseaua Mihai Bravu, Pantelimon, Iancului, Bulevardul Chișinău, la Piața Muncii

Latest News

16:54

Prosecutor Radu George Bucurică has remained in preventive detention after the High Court rejected his appeal. He is accused of violating the weapons regime and assault.

16:46

Keir Starmer, the former British Prime Minister, resigns from his parliamentary mandate.

16:45

Nicolae Ciucă becomes the administrator of the company ArmShield SRL, specialized in the manufacture of military aircraft and spacecraft.

16:37

The United States Marine Corps will celebrate its 251st anniversary with a ball organized in the Romanian Parliament.

16:26

The German government considers that the incident with the drone at Leipzig airport was an attempted attack ordered by Moscow.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest City Hall: 66 blocks in Aviației and Dorobanți will have hot water through a new pipeline
event image
Current Affairs
Modernization works announced for the thermal network in Bucharest: 1,500 blocks will remain without hot water
event image
Current Affairs
Hot water will be interrupted in several areas of Bucharest in the second half of July for works on the thermal network.
event image
Current Affairs
Ciprian Ciucu emphasized the need for a centralized heating system to reduce financial penalties and improve efficiency.
event image
Current Affairs
Ciucu discovers abandoned construction site on Calea Văcărești: only 3 workers at work
event image
Current Affairs
The Capital City Hall announces work over the weekend for the rapid closure of construction sites and to avoid the loss of European funds.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Capital City Hall heating pipes Stelian Bujduveanu Bucharest

Editor’s Recommendations

main event image
Politics
4 hours ago

President Nicușor Dan, speech in front of 2,400 Orthodox youth: "The public space is dominated by defeatists who say that we will never be able to do anything in this country. It seems that we no longer have the patience to listen to each other."

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
7 hours ago
Original Content

EXCLUSIVE | September 1, 2026. Trends in online searches / last 24 hours

main event image
Exclusive
7 hours ago
Original Content

01 September 2026. TV: What was discussed last night on the news channels

main event image
Current Affairs
3 hours ago

A drone was found crashed in a field in Vaslui County / Authorities are conducting checks

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol