search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
136 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Interim Mayor Stelian Bujduveanu announces the opening of bids for the consolidation of three overpasses in Bucharest, with a seismic risk grade V.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
11 November 2025, 09:32
main event image
Current Affairs
foto: Pixabay
google-preference

Always see our news on Google

Stelian Bujduveanu, the interim mayor of the Capital, announced the opening of bids for the reinforcement of three underpasses in Bucharest, classified as having a seismic risk of grade V: Lujerului Underpass, Bucur Obor Underpass, and Băneasa Bridge. The Bucharest Roads Administration (ASB) has initiated the public bidding procedures, and the evaluation of the bids will follow after the winners are designated.

Bucur Obor Underpass has an estimated value of 114.9 million lei, Lujerului Underpass 203.2 million lei, and Băneasa Bridge 21.8 million lei. Reinforcement is essential for the safety of users and the smooth flow of traffic. Recent expert assessments have highlighted the urgent need for these works to prevent structural degradation. Bids have been submitted by various construction associations, and the works will ensure traffic circulation under safe conditions.

Sources

sursa imagine
B365
Câți constructori vor să repare cele mai șubrede pasaje ale Bucureștiului: Bucur Obor, Lujerului și Pod Băneasa. PMB anunță că au fost deschise ofertele
sursa imagine
News.ro
Primarul general interimar al Capitalei: Ofertele depuse pentru consolidarea pasajelor Bucur Obor şi Lujerului şi a Podului Băneasa sunt în curs de evaluare / Valoarea totală a lucrărilor, peste 330 de milioane de lei

Latest News

08:44

Gabriela Ruse advances to round 2 at the WTA 1,000 in Toronto, after the victory against Peyton Stearns

08:31

25 U.S. states challenge the new import tariffs imposed by Donald Trump

08:05

Poland contests the ruling of the Brussels Tribunal to pay 1.3 billion euros for the Pfizer vaccines

07:45

Irineu Darău: "No matter how easy or populist it may be to promise some prices or even to limit them, great care must be taken / You cannot guarantee a price, but you can end up with shortages."

07:23

Superliga: The red-blues draw with Farul, score 2-2, and return to first place in the standings

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The General Council of Bucharest Municipality has approved contracting up to 990 million lei for the rehabilitation of passages and bridges.
event image
Current Affairs
The Capital City Hall announced the start of the rehabilitation works of the Basarab Passage on June 20
event image
Current Affairs
Two new road passages will be built in Ilfov: a three-level passage in Balotești and an underground passage in Bragadiru
event image
Current Affairs
The Bucharest City Hall wants to strengthen buildings with seismic risk, but apartment owners are blocking the strengthening of the homes.
event image
Current Affairs
The intersection between Colentina Road, Fundeni Road, Andronache Road, and Gherghitei Street will be reconfigured to improve traffic flow. The works will last 12 months.
event image
Current Affairs
Mayor Ciprian Ciucu announces infrastructure works in Bucharest, necessary for traffic flow and improvement of public transport.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
underground passages consolidation offers interim mayor
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol