search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
137 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Bidding for the first stage of the express road project Baia Mare – Satu Mare, for 19.68 km of road, with a value of 1.72 billion lei

Sara Dănciuț
whatsapp
facebook
linkedin
x
copy-link copy-link
13 February 2026, 11:02
main event image
Current Affairs
unsplash
google-preference

Always see our news on Google

The Maramureș County Council has announced the start of the bidding process for the first phase of an express road project that will connect Baia Mare to the major highways in the region. This phase includes two road sections with a total length of 19.68 km, with an estimated value of 1.72 billion lei, VAT included. The project, carried out in partnership with CNAIR, will remove heavy traffic from the municipality and facilitate access to Baia Mare International Airport and industrial areas. The total duration of the project is 30 months, of which 6 months for design and 24 months for execution.

In parallel, the Satu Mare County Council has obtained a favorable opinion for the feasibility study of the Satu Mare – Baia Mare Express Road, which will have a length of 59.17 km and a total value of 5.93 billion lei. The funding will come from external sources and the state budget, and the execution is estimated at 42 months, with the bidding planned for the first quarter of 2026.

Sources

sursa imagine
Profit.ro
Centură ocolitoare, scoasă la licitație. Npas pentru centura municipiului Baia Mare
maramuresonline.ro
Varianta de Ocolire Baia Mare, scoasă la licitație în SEAP. Investiție de 1,2 miliarde lei pentru prima etapă a proiectului

Latest News

22:59

SpaceX intends to develop a new major center for the Starship program in Louisiana, with an estimated investment of 100 billion dollars.

22:54

Nicușor Dan has notified the Constitutional Court regarding the unconstitutionality of the Decarbonization Law of the energy sector, which affects Romania's obligations in the field of environmental protection.

22:43

Kelemen Hunor, about the failure of the Salary Law: "Such a decision cannot be made responsibly in just a few days. We are not legislating for the European Commission."

22:23

President Nicușor Dan will have meetings on Thursday with Maia Sandu and Volodymyr Zelensky in Chișinău, on the occasion of the Independence Day of the Republic of Moldova

22:07

Dragoș Pîslaru and Radu Miruță accuse PSD of sabotaging the negotiations for the Salary Law and the loss of 770 million euros from PNRR

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Secretary of State in the Ministry of Transport announced the issuance of the construction permit for the first lot of the mountain sector of the Unirii Highway A8
event image
Current Affairs
Galați: The contract for the modernization of the Berheci-Brăhășești road axis has been signed, worth 111 million lei.
event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
The CNIR approved the Technical Project for section 1D Joseni-Ditrău of the A8 Highway, and the works will begin on August 17, 2026.
event image
Current Affairs
CNAIR announces significant progress in the construction of the Moldova Motorway (A7)
event image
Current Affairs
Ilie Bolojan announced the signing of the SAFE contract for section 4 of the "Union" A8 Highway, which will connect Romania to the Republic of Moldova.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Baia Mare satu mare auction express road Maramures project CNAIR

Editor’s Recommendations

main event image
Politics
Yesterday 18:04

Nicușor Dan, after the failure of the negotiations on the Salary Law: The parties assume the loss of the 770 million euros related to the milestone from the PNRR.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Exclusive
Yesterday 09:23

ANALYSIS Salaries in the public vs. private sector, in the EU. Romania, between the regional exception and the European rule

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol