search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
135 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The City Hall of Sector 4 has obtained the building permit for the rehabilitation of the Unirii Plain, necessary due to its advanced degradation

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
26 May 2025, 13:23
main event image
Current Affairs
Foto: pexels.com
google-preference

Always see our news on Google

The building permit for the reconstruction of the Unirii Plain was issued by the City Hall of Sector 4, signed by Mayor Nicușor Dan on his last day in office. The works include the rehabilitation of the planșe, the regeneration of public spaces, the reconstruction of the Dâmbovița river basin and the modernization of the public utilities. The conflict between Nicușor Dan and the mayor of Sector 4, Daniel Băluță, was intense over the degraded state of the floor, with Băluță accusing the passivity of the General City Hall.

Sources

sursa imagine
Stiripesurse
Ultima decizie luată de Nicușor Dan la Primăria Capitalei - A semnat pentru a pune punct 'războiului' cu Daniel Băluță
sursa imagine
Mediafax
Planșeului Unirii va fi refăcut din temelii: Nicușor Dan a semnat autorizația în ultima zi de mandat
sursa imagine
Economedia
Primăria Sector 4 a primit autorizația pentru reabilitarea Planșeului Unirii, în ultima zi de primar a lui Nicușor Dan
sursa imagine
G4Media
Primăria Sector 4 a primit autorizația pentru reabilitarea Planșeului Unirii, în ultima zi de primar a lui Nicușor Dan

Latest News

16:55

UEFA, CONCACAF and AFC discuss a possible vote of no confidence against Gianni Infantino

16:52

Radu Burnete, after the meeting at Cotroceni: The leaders of the former coalition received a new version of the salary law / When a possible consensus could come

16:44

Serbia has requested assistance from Russia for combating wildfires.

16:41

The USA would have secretly created a maritime corridor in the Strait of Hormuz through which 10 million barrels of oil pass daily.

16:40

Four workers died after being struck by a train at Shin-Kanuma station in Japan.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The rehabilitation project of Unirii Square has exceeded 60% of the total works.
event image
Current Affairs
The mayor of Sector 4, Daniel Băluță, criticizes the Minister of Transport for not paying the bills and blocking funding for the M4 subway line, citing political grievances.
event image
Current Affairs
The Capital City Hall announced the start of the rehabilitation works of the Basarab Passage on June 20
event image
Current Affairs
The Capital City Hall announces work over the weekend for the rapid closure of construction sites and to avoid the loss of European funds.
event image
Politics
Nicușor Dan convenes the parties for consultations on the Urbanism Code, an essential milestone for accessing PNRR funds.
event image
Current Affairs
Ciprian Ciucu takes responsibility for the criticisms related to the works in Bucharest: "No city can be repaired and put in order without construction sites."
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Sector 4 City Hall building authorization Union Floor

Editor’s Recommendations

main event image
Current Affairs
34 minutes ago

Radu Miruță, clarifications regarding the maritime drone near Neptun Deep

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
2 hours ago

Ciprian Ciucu, the general mayor of the Capital, remains under judicial control until October 15, 2026, after the Bucharest Tribunal rejected his appeal.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
6 hours ago

Andrei Pleșu: About public speaking

main event image
Exclusive
2 hours ago
Original Content

EXCLUSIVE The top themes in domestic politics in trends, in the last week

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol