search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
186 new news items in the last 24 hours
  1. Home
  2. International

The nuclear power plant in Paks could return to full capacity by Wednesday, announces the Prime Minister of Hungary.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
23 August 2026, 12:29
main event image
International
Credit: Attila KISBENEDEK / AFP / Profimedia
google-preference

Always see our news on Google

The Prime Minister of Hungary, Péter Magyar, announced that the Paks nuclear power plant in Hungary restarted reactor 3 on Saturday evening, and the facility could operate at maximum capacity of 2 gigawatts by Wednesday, a day or two earlier than initial estimates, according to Reuters cited by HotNews.


The plant, which produces nearly half of the country's electricity, had to reduce its output to over 10% due to a historic drought and low water levels on the Danube. Currently, the plant generates approximately 800 megawatts, with four out of eight turbines operating, according to the Prime Minister.

The rising water levels on the Danube, the main cooling agent, and engineering works carried out in the area have helped avoid a complete shutdown. The government has implemented short-term solutions, including the construction of a riverbed dam and the sinking of two barges to raise the water level.

Sources

sursa imagine
Hot News
Singura centrală nucleară din Ungaria va funcționa la capacitate maximă în curând, anunță Peter Magyar
sursa imagine
Digi24
Centrala nucleară Paks din Ungaria ar putea atinge capacitatea maximă de funcționare până miercuri, anunță premierul Peter Magyar
sursa imagine
Antena3
Ungaria a reluat producția la centrala nucleară de la Paks. Când va ajunge la capacitate maximă
sursa imagine
Economica
Ungaria reia, gradual, producţia la centrala nucleară de la Paks
sursa imagine
Agerpres
Ungaria reia, gradual, producția la centrala nucleară de la Paks
sursa imagine
Stirile ProTV
Ungaria reia producția de energie nucleară. Centrala de la Paks își revine treptat
sursa imagine
Economedia
Ungaria: Centrala nucleară de la Paks revine, gradual, în funcțiune
sursa imagine
G4Media
Centrala nucleară Paks revine treptat la capacitate maximă. Țara a intervenit pentru a evita oprirea reactorului
sursa imagine
News.ro
Centrala nucleară Paks din Ungaria ar putea reveni la capacitate maximă până miercuri

Latest News

11:40

George Simion announces full support for Călin Georgescu: The AUR leader stated on TVR 1 that the former candidate’s cases are “political” and orchestrated by people who control the institutions

11:34

USR protested in Parliament with toy airplanes and placards, calling for an investigation into private flights to Mykonos and Nice

11:30

Sorin Grindeanu responds to George Simion following the accusations regarding the appearance of his name in the ARR case file: “I have not seen statements crossed out with a marker at the prosecutors’ office; that is only valid in films about Russian spies. Films that Simion watches”

11:29

Robert Sighiartău announces that PNL will not enter government, but could support the Niculescu Government in the investiture vote

11:24

CEC Bank co-finances the construction of a new oil factory in Cluj / The facility will become operational at the end of 2027

See more news

NEWS ON THE SAME TOPICS

event image
International
Hungary: Péter Magyar announces that reactor 3 at the Paks nuclear power plant could be restarted ahead of schedule due to the work carried out and the rising level of the Danube.
event image
International
The Paks nuclear power plant in Hungary operates at reduced capacity due to the low level of the Danube.
event image
International
The reactors of the nuclear power plant in Paks are operating at below 50% capacity due to the decrease in the water level of the Danube. Prime Minister Magyar warns that the plant could be completely shut down.
event image
International
The level of the Danube has started to rise: Hungary reconnects a turbine at the Paks power plant, which supplies half of the country's energy.
event image
International
Hungary: The construction of a riverbed threshold on the Danube has raised the water level by 15-20 cm, preventing the shutdown of the turbines at the Paks nuclear power plant.
event image
International
The Hungarian government has started works to raise the level of the Danube near the nuclear power plant in Paks.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
reactor Nuclear Power Plant paks Hungary restart Péter Magyar

Editor’s Recommendations

main event image
Politics
12 minutes ago

Robert Sighiartău announces that PNL will not enter government, but could support the Niculescu Government in the investiture vote

Sources
imagine sursa
imagine sursa
main event image
Politics
43 minutes ago

Luca Niculescu and Sorin Grindeanu discussed by phone / What conditions does the PSD set for supporting the Government (Sources)

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
2 hours ago

Exclusively Monitorul Miniștrilor by NewsVibe: 1–7 October 2026 / Alexandru Nazare leads the visibility rankings amid debates about the country's rating

main event image
Exclusive
2 hours ago
Original Content

October 7, 2026. TV: What was discussed last night on the news channels

main event image
Current Affairs
2 hours ago

Călin and Cristela Georgescu arrived at DIICOT for the second day of computer searches in the case involving damages of €1.1 million

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+9
main event image
Exclusive
2 hours ago
Original Content

EXCLUSIVE | October 7, 2026. Online search trends / last 24 hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol