search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
171 new news items in the last 24 hours
  1. Home
  2. International

The nuclear power plant in Paks could return to full capacity by Wednesday, announces the Prime Minister of Hungary.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
23 August 2026, 12:29
main event image
International
Credit: Attila KISBENEDEK / AFP / Profimedia
google-preference

Always see our news on Google

The Prime Minister of Hungary, Péter Magyar, announced that the Paks nuclear power plant in Hungary restarted reactor 3 on Saturday evening, and the facility could operate at maximum capacity of 2 gigawatts by Wednesday, a day or two earlier than initial estimates, according to Reuters cited by HotNews.


The plant, which produces nearly half of the country's electricity, had to reduce its output to over 10% due to a historic drought and low water levels on the Danube. Currently, the plant generates approximately 800 megawatts, with four out of eight turbines operating, according to the Prime Minister.

The rising water levels on the Danube, the main cooling agent, and engineering works carried out in the area have helped avoid a complete shutdown. The government has implemented short-term solutions, including the construction of a riverbed dam and the sinking of two barges to raise the water level.

Sources

sursa imagine
Hot News
Singura centrală nucleară din Ungaria va funcționa la capacitate maximă în curând, anunță Peter Magyar
sursa imagine
Digi24
Centrala nucleară Paks din Ungaria ar putea atinge capacitatea maximă de funcționare până miercuri, anunță premierul Peter Magyar
sursa imagine
Antena3
Ungaria a reluat producția la centrala nucleară de la Paks. Când va ajunge la capacitate maximă
sursa imagine
Economica
Ungaria reia, gradual, producţia la centrala nucleară de la Paks
sursa imagine
Agerpres
Ungaria reia, gradual, producția la centrala nucleară de la Paks
sursa imagine
Stirile ProTV
Ungaria reia producția de energie nucleară. Centrala de la Paks își revine treptat
sursa imagine
Economedia
Ungaria: Centrala nucleară de la Paks revine, gradual, în funcțiune
sursa imagine
G4Media
Centrala nucleară Paks revine treptat la capacitate maximă. Țara a intervenit pentru a evita oprirea reactorului
sursa imagine
News.ro
Centrala nucleară Paks din Ungaria ar putea reveni la capacitate maximă până miercuri

Latest News

18:25

Luca Niculescu and Mark Rutte discussed security in the Black Sea and hybrid threats on the eastern flank

18:25

The European Commission postpones the adoption of Austria’s restrictions on children under 14 accessing certain video platforms

18:14

A 53-year-old man from Prahova was injured after an explosion occurred in his home

18:01

The Cernavodă nuclear power plant remains shut down / The reactors cannot be restarted because of the Danube’s low flow rate

17:59

Two founders of a foundation were detained after DMT, coca leaves, and cannabis were found at a retreat in Hunedoara.

See more news

NEWS ON THE SAME TOPICS

event image
International
Hungary: Péter Magyar announces that reactor 3 at the Paks nuclear power plant could be restarted ahead of schedule due to the work carried out and the rising level of the Danube.
event image
International
The Paks nuclear power plant in Hungary operates at reduced capacity due to the low level of the Danube.
event image
International
The level of the Danube has started to rise: Hungary reconnects a turbine at the Paks power plant, which supplies half of the country's energy.
event image
International
Hungary: The construction of a riverbed threshold on the Danube has raised the water level by 15-20 cm, preventing the shutdown of the turbines at the Paks nuclear power plant.
event image
International
The Hungarian government has started works to raise the level of the Danube near the nuclear power plant in Paks.
event image
International
The Prime Minister of Hungary announces the construction of a dam on the Danube, at Paks, and the preparation for the sinking of two barges to raise the water level.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
reactor Nuclear Power Plant paks Hungary restart Péter Magyar

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

Alexandru Nazare rejects the requests for 60 billion lei and announces the emergency budget revision

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
1 hour ago

Daniel Fenechiu announces the removal of the controversial article from the draft Law on the Legal Profession

Sources
imagine sursa
imagine sursa
main event image
Opinions
7 hours ago

Andrei Pleșu: On Democracy. Notes from the New Europe College

main event image
Exclusive
1 hour ago

EXCLUSIVE The ranking of companies in relevant online sources in Romania: Dacia leads company visibility. Taxation dominates the economic agenda

main event image
Exclusive
8 hours ago

EXCLUSIVE Ranking of domestic political topics trending over the past week / The appointments made by the Niculescu Government, accusations against Alexandru Toader, and the CCR decision regarding SAFE

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol