After the devastating floods in the spring of last year, the authorities decided to intervene in Praid through an investment of approximately 330 million lei, approved on February 19 by the government at the proposal of the Ministry of Environment. The project aims to reduce the risk of flooding on the Corund River and protect the local community, including the Praid Salt Mine, which was severely affected by the floods in 2025.
The project includes the construction of a temporary reservoir, the arrangement of the Corund River over a length of more than 7 kilometers, and the construction of a 1.2-kilometer underground channel to manage extreme flows. This intervention marks a transition from temporary solutions to structural measures, essential in the context of the intensification of extreme weather phenomena.
The Praid area is crucial from an economic point of view, and the impact on the Salt Mine has generated significant losses. The investment is an important step towards preventing future crises, having the potential to become a model for other regions exposed to flood risks. The Praid Salt Mine remains closed due to water infiltrations, and the authorities continue safety assessments before resuming activities.
The project includes the construction of a temporary reservoir, the arrangement of the Corund River over a length of more than 7 kilometers, and the construction of a 1.2-kilometer underground channel to manage extreme flows. This intervention marks a transition from temporary solutions to structural measures, essential in the context of the intensification of extreme weather phenomena.
The Praid area is crucial from an economic point of view, and the impact on the Salt Mine has generated significant losses. The investment is an important step towards preventing future crises, having the potential to become a model for other regions exposed to flood risks. The Praid Salt Mine remains closed due to water infiltrations, and the authorities continue safety assessments before resuming activities.
Sources
330 de milioane de lei, investiție strategică pentru protejarea zonei Praid de inundații
332.000.000 de lei va plăti România pentru un baraj și un rezervor care să protejeze Praid de inundații. Cum rămâne cu vina companiei Salrom
Guvernul aprobă sistemul de protecție împotriva inundațiilor de la Praid: investiție de 330 de milioane de lei
Latest News
21:43
Raphaël Glucksmann will run in the presidential elections in France in 2027
21:20
A few hundred people gathered in Victory Square in Timișoara to support Mayor Dominic Fritz.
21:12
Interim Prime Minister Ilie Bolojan, about the salary law: "This proposal must be made in such a way that it can be supported by the Romanian economy from the state budget."
21:02
Interim Prime Minister Ilie Bolojan criticizes the "Fritz amendment" from the Integrity Law: "Voting on a PNRR milestone does not mean using it as a political club."
20:54
Ilie Bolojan criticized the statements of former minister Ivan regarding the disconnection of industrial consumers from the National Energy System, emphasizing that the notifications are part of a legal procedure.
See more news