search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
68 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The CNIR approved the Technical Project for section 1D Joseni-Ditrău of the A8 Highway, and the works will begin on August 17, 2026.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
13 August 2026, 18:40
main event image
Current Affairs
Foto: facebook.com/proinfrastructura
google-preference

Always see our news on Google

The National Company for Road Investments (CNIR) announced that the works for lot 1D Joseni-Ditrău of the A8 Highway Târgu Mureș - Târgu Neamț will begin on Monday, August 17, 2026, after the approval of the Technical Execution Project. This is the first highway lot in the mountain sector of A8 and will be built in Harghita County, with an execution period of 24 months. Over a length of 14.4 kilometers, the project includes 18 bridges, passages, viaducts, 3 wildlife overpasses, a road junction at Ditrău, and a temporary discharge for connection with the next lot.


All works will utilize BIM (Building Information Modeling) technology, which allows for efficient management of digital data, preventing improper planning and identifying additional costs. The contractor Association Danlin XXL - Groma Hold LTD - Intertranscom Impex S.R.L. will implement BIM throughout the entire project cycle, ensuring quality execution and reducing risks and delays.

Sources

sursa imagine
G4Media
CNIR: A fost avizat proiectul Tehnic de Execuţie al lotului 1D Joseni-Ditrău, al Autostrăzii A8 / Lucrările vor începe din 17 august
sursa imagine
Agerpres
CNIR: Proiectul Tehnic de Execuție al lotului 1D Joseni-Ditrău a fost avizat; lucrările vor începe din 17 august

Latest News

21:00

Alexandru Ioan Cuza University of Iaşi suspends the contract of Alexandru Toader, Tudorel Toader’s son, following the decision to place him in pre-trial detention

20:43

France: Jordan Bardella was re-elected to lead the Rassemblement National party with nearly 99%

20:09

ECHR rejects Judge Dorin Munteanu’s application because he concealed the compensation proceedings in Moldova

19:53

The Minister of Health inspected the construction site of the Iași Regional Emergency Hospital / The hospital is expected to be able to receive patients in 2029

19:25

Cracked apartment building in Drumul Taberei: The State Inspectorate for Construction found that the building’s load-bearing structure is not affected / Residents have returned to the building

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Horațiu Cosma announces record mobilization on the Joseni-Ditrău section of the A8 Motorway
event image
Current Affairs
CNIR conducts tests for the design of a section of the A8 Highway
event image
Current Affairs
CNAIR: The reception committee for the Zimbor - Poarta Sălajului section of the Transylvania Highway starts on Monday
event image
Current Affairs
In August, drivers will be able to travel on 12 km of the Transylvania Highway and 45 km of the Moldova Highway.
event image
Economy
A new section of the Moldova Highway opens to traffic / A7 now reaches Bacau
event image
Current Affairs
Horațiu Cosma announces progress on the works on the Transylvania Motorway / The Nădășelu–Zimbor section could open in 2026
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
highway Târgu Mureș things

Editor’s Recommendations

main event image
Opinions
Yesterday 16:46

Andrei Cornea: Disgust

main event image
Current Affairs
13 hours ago

Romania switches to winter time / Clocks are turned back one hour, and Sunday will have 25 hours

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol