search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
84 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Petromidia and Vega refineries return to optimal capacity after maintenance.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
30 March 2026, 10:58
main event image
Current Affairs
Foto: www.facebook.com/ Rompetrol - KMG International
google-preference

Always see our news on Google

Rompetrol Rafinare has announced the successful completion of the planned maintenance at the Petromidia Năvodari and Vega Ploiești refineries, which will soon resume at optimal capacity.


The maintenance included over 700 maintenance works, the replacement of catalysts in six main installations, and checks on approximately 900 pieces of equipment. Additionally, nearly 1,200 pipelines were inspected and tested. An important aspect of the maintenance was the recertification and extension of operating permits by the competent authorities. The work was carried out with the help of over 2,500 specialists, thus ensuring the continuity of technological processes and environmental protection. Rompetrol Rafinare halted refinery operations at the beginning of March for this work, which was scheduled to last approximately 20 days.

Sources

sursa imagine
G4Media
Se redeschid rafinăriile Petromidia Năvodari și Vega Ploiești, după o serie de peste 700 de lucrări de mentenanță
sursa imagine
EuropaFM
Rafinăriile Petromidia Năvodari și Vega Ploiești, redeschise după sute de lucrări de mentenanță | AUDIO

Latest News

14:26

Poland’s Foreign Minister claims that NATO could quickly defeat Russia if Moscow attacked the alliance

14:26

The European Commission approves aid of 52 million euros for Romanian cattle breeders affected by rising fuel prices

14:21

The AEP allocated 15.47 million lei to the parties in September. The PSD received the largest amount

14:17

Finland joins the nuclear deterrence initiative proposed by France

14:16

Sorin Grindeanu reportedly proposed an anti-AUR pact to Ilie Bolojan / Liberal leader reportedly rejected it

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Rompetrol Rafinare announces the modernization of five tanks at the Petromidia Refinery
event image
Economy
Rompetrol Rafinare reports a consolidated gross turnover of 3.5 billion USD in the first half of 2026, an increase of 25% compared to the same period in 2025.
event image
Economy
OMV Petrom: investment of 140 million euros at the Petrobrazi refinery. It will put into operation a new aromatic products unit.
event image
Current Affairs
Rompetrol will build a 4.8 MW photovoltaic power plant at the Vega Ploiești Refinery, with an investment of 27 million lei
event image
Economy
OMV Petrom invests 115 million euros in the electrical infrastructure at Petrobrazi
event image
Current Affairs
Rompetrol Energy successfully tested the cogeneration plant on the Petromidia platform in an islanded mode, ensuring industrial supply in case of a blackout.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
refineries petromidia Vega revisie

Editor’s Recommendations

main event image
INSCOP Surveys
5 hours ago

BAROMETER Informat.ro - INSCOP Research - 14th Edition, September 2026. Chapter IV: The Country’s Direction / Romanians Are Becoming Increasingly Pessimistic

main event image
Exclusive
3 hours ago

ANALYSIS Bab-el-Mandeb under siege: the stakes of a strait that could shake global trade and Romania’s bill

main event image
Exclusive
4 hours ago
Original Content

September 14, 2026. TV: What was discussed last night on the news channels

main event image
Current Affairs
1 hour ago

MoND announces the Burebista 26 exercise: low-altitude flights and military convoys throughout the country / “Don’t panic, these are training exercises”

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+3
main event image
International
59 minutes ago

SPECIAL Informat.ro / From the Arctic to the Black Sea: why the summit in Rovaniemi matters for Romania

main event image
Opinions
6 hours ago
Editorials and opinions

Europe’s new energy doctrine

main event image
Exclusive
4 hours ago

EXCLUSIVE The top sports topics of the past week

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol