search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
67 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The HVDC submarine cable project Romania-Georgia is advancing towards implementation

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
13 July 2026, 19:10
main event image
Current Affairs
Transelectrica
google-preference

Always see our news on Google

The high voltage direct current (HVDC) submarine cable project that will connect Romania to Georgia through the Black Sea is advancing to the technical preparation stage, following the signing of the Memorandum of Understanding between Transelectrica and the Georgian State Electrosystem (GSE).


This partnership will enable the construction of energy infrastructure that will facilitate the transport of electricity between the two countries, contributing to energy security and the integration of renewable sources into the European system. The project, estimated at 3.5 billion euros, has already surpassed the feasibility study stage and is included in the Ten-Year Network Development Plans of ENTSO-E.


The submarine cable will be approximately 1,200 kilometers long and will create a new energy transport route from Azerbaijan, through Georgia and Romania, to Hungary and other European markets.


The project company, Green Energy Corridor Power Company, will coordinate the implementation of the investment, which is part of the Strategic Partnership Agreement in the field of green energy signed by the governments of Azerbaijan, Georgia, Romania, and Hungary.

Sources

sursa imagine
Economedia
Cablul submarin din Marea Neagră avansează. Transelectrica intră în etapa pregătirilor tehnice pentru interconectarea energetică România–Georgia
sursa imagine
Newsweek
Transelectrica: Proiectul cablului submarin din Marea Neagră intră în etapa pregătirilor tehnice * Newsweek România

Latest News

20:09

ECHR rejects Judge Dorin Munteanu’s application because he concealed the compensation proceedings in Moldova

19:53

The Minister of Health inspected the construction site of the Iași Regional Emergency Hospital / The hospital is expected to be able to receive patients in 2029

19:25

Cracked apartment building in Drumul Taberei: The State Inspectorate for Construction found that the building’s load-bearing structure is not affected / Residents have returned to the building

19:07

Israel closed the access points to Hebron and forcibly displaced nearly 500 families in retaliation

19:00

Two people suffered burns after an explosion followed by a fire in a home in Roșiorii de Vede

See more news

NEWS ON THE SAME TOPICS

event image
Republic of Moldova
U.S. Embassy announces the “Trump Liberty Line,” a new electricity connection between Romania and Moldova
event image
International
US Embassy Launches Working Group for the Strășeni-Gutinaș Power Line
event image
Current Affairs
Transelectrica announces an increase in storage capacity to 1,162 MW, but experts warn about costs passed on to consumers
event image
EU
Romania has hydrogen projects, but connections are missing from the scenario analyzed by ENTSOG
event image
Current Affairs
DEER has signed a contract for the modernization of the electrical network in Cluj-Napoca and Florești, benefiting from 237 million lei from European funds.
event image
Current Affairs
Romania, Bulgaria and Greece are preparing joint applications through the Connecting Europe Facility for the development of the Baltic Sea–Black Sea–Aegean Sea corridor
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
project HVDC Romania Georgia submarine cable

Editor’s Recommendations

main event image
Opinions
Yesterday 16:46

Andrei Cornea: Disgust

main event image
Current Affairs
13 hours ago

Romania switches to winter time / Clocks are turned back one hour, and Sunday will have 25 hours

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol