search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
41 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The National Company for Road Investments announced that the feasibility study for the Bucharest–Giurgiu highway began on Monday, January 19, 2026.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
19 January 2026, 20:23
main event image
Current Affairs
Foto: Pexels
google-preference

Always see our news on Google

In December 2025, the company signed a contract for the preliminary design of the Bucharest-Giurgiu highway/express road, with an association of engineering firms from Romania and Turkey. The value of the contract is 34 million lei, funded by European funds. The Feasibility Study will analyze aspects such as the road profile (highway or express road), route options, and connections with other investments, including the future Bridge over the Danube at Giurgiu-Ruse. CNIR requested an analysis of construction materials, comparing the cement concrete road system with the asphalt one. The study will underpin the documentation necessary for the next design and execution tender. This highway will facilitate the connection with Bulgaria and will contribute to the modernization of road transport and connectivity between the two countries.

Sources

sursa imagine
Economica
CNIR anunță că studiul de fezabilitate pentru drumul de mare viteză Bucureşti-Giurgiu a demarat luni
sursa imagine
Agerpres
CNIR: Studiul de Fezabilitate pentru Drumul de mare viteză București-Giurgiu a demarat luni

Latest News

20:33

A EU mission led by Italy has descended on a Russian tanker from the "phantom fleet" in the Mediterranean Sea.

20:15

IGSU, after the collision of two helicopters in Greece: Romania does not have aircraft or pilots deployed in Greece, and the Romanian firefighters in the area are safe.

19:53

The first detonation to divert the Danube towards Cernavodă has failed. The military will resume the intervention on Monday.

19:36

Aș propose that we no longer be surprised...

19:23

Belarus is establishing an airborne assault brigade 40 kilometers from Ukraine

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNAIR has announced the winner of the tender for the Feasibility Study of the Giurgiu–Ruse 2 cross-border bridge, awarded to Egis Romania for 50.04 million lei
event image
Current Affairs
Environmental agreement for the Buzău–Brăila Expressway: the 112 km project enters a new phase
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
The construction of the Oradea - Arad Expressway could begin this summer, after the project was taken over by CNIR.
event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
Ilie Bolojan announced the signing of the SAFE contract for section 4 of the "Union" A8 Highway, which will connect Romania to the Republic of Moldova.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
bucuresti giurgiu design contract feasibility study

Editor’s Recommendations

main event image
Current Affairs
4 hours ago

Another RO-Alert message in Tulcea County. The Ministry of National Defense has deployed two F-16 aircraft for monitoring.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+4
main event image
Exclusive
Yesterday 09:15
Original Content

IT News Review by Control F5 Software: AI cameras can detect phone use while driving

main event image
Opinions
13 hours ago

Sever Voinescu: Temptation and tendency

main event image
Opinions
1 hour ago
Editorials and opinions

Aș propose that we no longer be surprised...

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol