search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
140 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The builders for the first 43 km of the DEx Suceava-Siret have been designated by CNAIR.

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
7 April 2026, 13:39
main event image
Current Affairs
Foto: facebook.com/Cristian Pistol
google-preference

Always see our news on Google

The general director of CNAIR, Cristian Pistol, announced on Tuesday that the constructors for the first 43 km of the Suceava-Siret Express Road have been designated. The association FAR FOUNDATION SRL – AUTOMAGISTRAL PIVDEN SRL – LINCOR TRANS SRL will design and execute lots 1 and 2, with a total value of 3.72 billion lei (excluding VAT). Lot 1, with a length of 18.6 km, has a bid value of 2.09 billion lei, while Lot 2, at 24.45 km, costs 1.63 billion lei. The contracts provide for deadlines of 9 months for design and 24 months for execution. Along the route, 57 structures and 4 road junctions will be built, including parking lots with charging stations for electric vehicles. Pistol emphasized that all contracts must be signed by the end of May 2026, and the works completed by 2030, according to the financing conditions through SAFE. The Suceava-Siret Express Road, with a total length of 55.7 km, will connect the road infrastructure in Romania with that in Ukraine, having both civil and military roles. Of the 16 billion euros allocated through SAFE for Romania, 4.2 billion euros are intended for road infrastructure.

Sources

sursa imagine
News.ro
Cristian Pistol: Primii 43 km ai DEx Suceva -Siret au constructori desemnaţi / Trebuie să fie finalizate cel mai târziu până în anul 2030, conform condiţiilor impuse de finanţarea prin SAFE
sursa imagine
Mediafax
Au fost desemnați constructorii pentru primele două loturi ale DEx Suceava-Siret
sursa imagine
Economica
Drum Expres Suceava – Siret: Constructor din Ucraina, desemnat câştigător pe primele două tronsoane

Latest News

10:23

The Romanian government canceled the visit by the U.S. Congressional delegation, scheduled for Friday at Victoria Palace

10:11

Large pig and poultry farms will apply the new EU emissions standards starting in 2030

10:02

CNSU prepares interventions at Cernavodă / Barges, pumps, and possible navigation restrictions following the record drop in the Danube's water level

09:58

Dolj police officers arrested a man wanted internationally for robberies committed in Venice.

09:50

Rapper Ian apologized after urinating on stage in front of the audience at the Roman Arenas

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Bucharest Court of Appeal annulled the awarding of lots 1 and 2 of the Suceava–Siret Expressway and ordered CNAIR to reevaluate the bids
event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
Irinel Ionel Scrioșteanu announces the installation of the last element of the bridge over the Siret on the Braila-Galati Expressway, which will be opened to traffic by the end of the year.
event image
Economy
CNAIR announces progress of over 60% on the A7 Bacău–Pașcani Motorway and the opening of at least 49 kilometers this year
event image
Current Affairs
The CNIR issued the Expropriation Decision for the properties along the Focșani-Brăila Express Road route, affecting 3,297 properties and an area of 8,557,483 square meters.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR express road Suceava Siret

Editor’s Recommendations

main event image
Politics
3 hours ago

Sorin Grindeanu returns Ilie Bolojan’s offer / PSD votes for a minority PNL-UDMR government. Come on!

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Current Affairs
Yesterday 20:06

Luca Niculescu: We had good and very concrete discussions with the leaders of the PSD, PNL and UDMR

Sources
imagine sursa
main event image
Exclusive
1 hour ago
Original Content

October 9, 2026. TV: What was discussed last night on the news channels

main event image
Politics
1 hour ago

Călin Georgescu was taken to DIICOT / Digital searches continue for the fourth consecutive day

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol