search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
121 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Mayor Ciprian Ciucu announces that Bucharest will become a construction site in the coming years, for the modernization of the infrastructure

Matei Gaginsky
whatsapp
facebook
linkedin
x
copy-link copy-link
12 May 2026, 09:55
main event image
Current Affairs
Foto: Facebook/ Ciprian Ciucu
google-preference

Always see our news on Google

The general mayor of Bucharest, Ciprian Ciucu, stated that the city will transform into a huge construction site for 4-5 years, taking on potential criticism from the Bucharest residents. In an interview, he explained that the municipality was forced to open several construction sites simultaneously for the modernization of the tram lines, otherwise it risks losing European funds.


Ciucu emphasized that the city's infrastructure has reached its breaking point, with tram lines that are 50-60 years old. He promised that by the end of this process, the city will look significantly better.


The mayor also mentioned the necessity of rehabilitating the sewage system and other essential works, including in Herăstrău Park, where the banks are at risk of collapsing. He also acknowledged that the discomfort caused by the construction sites is inevitable, but emphasized that it is a necessary measure to civilize the city.

Sources

sursa imagine
Antena3
Ciprian Ciucu anunță 5 ani de șantiere în București. "Îmi asum înjurăturile"
sursa imagine
B365
Dl. Ciucu ne explică de ce e plin orașul de șantiere, nu și de muncitori. “Am avut două probleme”, spune primarul despre peisajul urban ciuruit, dar împrejmuit

Latest News

20:37

Bruegel proposes redirecting funding for AI gigafactories toward faster permitting and grid connections for data centers

20:22

Ryanair disputes the injured passenger’s claim on a Greece-Germany flight. The company maintains that he was pulled toward the window, but did not go through it

20:05

The Russian Orthodox Church sent a relic of Dmitry Donskoy to Donetsk to boost the morale of Russian soldiers

19:50

Romanian police have apprehended four men wanted by Denmark for the murder of a fellow national, whose body was allegedly thrown into a river

19:43

Russian Embassy challenges sabotage allegations / Moscow denounces “speculation” in case of arrested Russian citizen

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Mayor of the Capital, Ciprian Ciucu, explained the necessity of the construction sites for the modernization of the city.
event image
Current Affairs
Ciprian Ciucu takes responsibility for the criticisms related to the works in Bucharest: "No city can be repaired and put in order without construction sites."
event image
Politics
General Mayor Ciprian Ciucu: Bucharest City Hall lost 80% of the PNRR funds before I became mayor
event image
Current Affairs
Ciprian Ciucu announced the start of the installation works for the tram line under the Constanța Bridge, with an estimated completion in three weeks.
event image
Current Affairs
Ciprian Ciucu convened construction companies and utility operators to reduce the impact of construction sites on traffic in Bucharest
event image
Economy
Ciprian Ciucu: The Capital City Hall is facing major financial problems.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Ciprian Ciucu Bucharest building site infrastructure modernization

Editor’s Recommendations

main event image
INSCOP Surveys
11 hours ago

BAROMETER Informat.ro - INSCOP Research - 14th Edition, September 2026. Chapter III: Voting intention in parliamentary elections / AUR nearly reaches the combined level of the next three parties

main event image
Economy
1 hour ago

Russian Embassy challenges sabotage allegations / Moscow denounces “speculation” in case of arrested Russian citizen

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
3 hours ago

Sorin Grindeanu would pressure Kelemen Hunor to vote for a PSD government, using AUR’s bill on Flag Day (sources)

Sources
imagine sursa
imagine sursa
main event image
Opinions
9 hours ago

A brief anthology of embittered patriotism

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol