search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
66 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNAB has launched the tender for the modernization of Runway no. 1 of 'Henri Coandă' Airport, with an estimated value of 106 million euros and an execution period of 16 months.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
26 November 2025, 11:41
main event image
Current Affairs
Foto: Shutterstock.com
google-preference

Always see our news on Google

The National Company Bucharest Airports (CNAB) has announced the launch of a public tender for the modernization of Runway No. 1 at 'Henri Coandă' Otopeni Airport, a major project with an estimated value of approximately 106 million euros. The works will last a maximum of 16 months and will include the complete reconstruction of the runway, the construction of 5 new taxiways, the modernization of 2 existing taxiways, the replacement of the lighting systems, and the modernization of the underground cable routes.


The project will be carried out in phases to ensure the continuity of airport operations and access for military aircraft. The deadline for submitting bids is December 18, 2025, and the last major modernization of the runway took place in 1994.

Sources

sursa imagine
Digi24
Licitaţie de peste 100 de milioane de euro pentru modernizarea pistei nr. 1 a Aeroportului Otopeni. Cât vor dura lucrările
sursa imagine
News.ro
A fost lansată licitaţia publică pentru modernizarea pistei nr. 1 de decolare/aterizare a Aeroportului Otopeni. Contractul are o valoare estimată la aproximativ 106 milioane euro. Ultima modernizare capitală a pistei nr.1 a avut loc acum 31 de ani
sursa imagine
Economica
Aeroportul Otopeni intră într-o nouă eră. Cel mai important proiect de investiţii din istoria sa – Ce se construieşte şi ce se schimbă la cel mai mare aeroport din România

Latest News

14:55

The Bucharest Stock Exchange lost over 18 billion lei in market capitalization this week

14:45

Firefighters from Alba extinguished the blaze that broke out in the technical room of Scărișoara Town Hall

14:39

Residents of the village of Barnham, in southeastern England, symbolically voted for autonomy in protest against the asylum seekers’ center

14:35

Diana Buzoianu attacks Alexandru Rogobete over electronic cigarettes

14:22

The Danube’s flow at the point where it enters the country will increase to 4,500 cubic meters per second, approaching the multi-year average for November of 4,700 cu m/s, according to the INHGA forecast

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Bucharest National Airports Company wants to purchase an electric aircraft tug for aircraft weighing up to 100 tons
event image
Current Affairs
Metrorex restricts traffic on DN1 / The Otopeni–Bucharest direction will have two lanes for 10 days
event image
Current Affairs
Timișoara Airport will resume flights on November 22, after runway works are completed
event image
Current Affairs
Bucharest City Hall is accelerating 12 major infrastructure projects in 2026
event image
Current Affairs
Five bids submitted to Bucharest City Hall for the reconstruction of Calicilor Bridge and the modernization of the Dâmbovița riverbanks between Unirii Square and Izvor Bridge
event image
Current Affairs
The Mayor of Bucharest launches the procedure for the purchase of 79 new trams, worth over 1.4 billion lei
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAB Henri Coandă Otopeni Airport

Editor’s Recommendations

main event image
Opinions
Yesterday 19:08

Sever Voinescu: The Misadventures of a Press Conference

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol