search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
126 new news items in the last 24 hours
  1. Home
  2. International

Czechia will invest in extending the lifespan of nuclear reactors to ensure stable electricity.

Emese Grancsa
whatsapp
facebook
linkedin
x
copy-link copy-link
9 April 2026, 17:50
main event image
International
Credit foto: shutterstock.com
google-preference

Always see our news on Google

As part of its long-term energy strategy, the Czech Republic has decided to extend the lifespan of the four nuclear reactors at the Dukovany power plant. The Minister of Industry and Trade, Karel Havlicek, justified this measure by the anticipated increase in electricity consumption and production, emphasizing that nuclear energy is essential for ensuring a stable, safe, and competitive energy source.


Extending the lifespan of the reactors will require significant investments, according to the CEO of CEZ, Daniel Benes. The Dukovany power plant, which generates over 40% of the Czech Republic's energy, has four Soviet-designed reactors, and CEZ has signed contracts with the South Korean group KHNP for the construction of two new APR1000 reactors. Additionally, CEZ will collaborate with the French company Framatome for the development of next-generation nuclear fuel, aiming to diversify suppliers and reduce dependence on Russia.

Sources

sursa imagine
Economica
Cehia prelungește cu 20 de ani durata de viață pentru patru reactoare nucleare
sursa imagine
Antena3
Cehia prelungește cu 20 de ani utilizarea reactoarelor nucleare din vremea URSS, pe fondul crizei energetice provocată de război
sursa imagine
Financial Intelligence
Cehia prelungeşte, cu 20 de ani, durata de viaţă a patru reactoare nucleare

Latest News

07:15

MAE, the first clarifications after the arrest of a Romanian woman in Germany, in a case of espionage in favor of Russia

22:54

Iulia Navalnaya urges Russians to vote for Yabloko: the September elections, a legal referendum against the war

22:39

The air forces of Bulgaria, Romania, and Spain have signed a trilateral agreement for air policing operations within NATO.

22:30

The government has approved the 'Diaspora Invests at Home' program, which offers grants of up to 200,000 euros to Romanians from the Diaspora for businesses in Romania.

22:22

The crisis in Ceuta unites the Spanish extremes: Sumar and Vox demand the exclusion of Morocco from the 2030 World Cup.

See more news

NEWS ON THE SAME TOPICS

event image
International
The Krško nuclear power plant in Slovenia will reduce production to 80% of capacity due to low water levels and high temperatures of the Sava River.
event image
International
The U.S. Department of Energy has announced a funding program of 17.5 billion dollars for the construction of ten nuclear reactors.
event image
International
Poland is looking for a partner for the second nuclear power plant it plans to build.
event image
Economy
Nuclearelectrica: EIB approved a loan of 800 million euros for the modernization of Unit 1 CNE Cernavodă
event image
EU
The Commission is preparing a guarantee of 200 million euros for small modular reactors and strengthens the security of imported inverters.
event image
Current Affairs
Reactor 2 of the nuclear power plant in Cernavodă can operate for four to five days due to the low flow of the Danube. Authorities are discussing measures to divert water and save energy.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Czech Republic nuclear reactors Energy EU

Editor’s Recommendations

main event image
Opinions
Yesterday 12:44
Editorials and opinions

The open society and its narrative enemies

main event image
Opinions
Yesterday 08:52

Andrei Pleșu: 1871-2019 – immortal Romanian traditions

main event image
Opinions
Yesterday 11:26

Romania closed its coal on paper and built gas plants from words

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol