search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
54 new news items in the last 24 hours
  1. Home
  2. Economy

Electrica has obtained the technical connection approvals for 17 electricity storage projects, having a total capacity of 700 MWh

Matei Gaginsky
whatsapp
facebook
linkedin
x
copy-link copy-link
30 June 2026, 10:42
main event image
Economy
Foto: pixabay
google-preference

Always see our news on Google

The Energy Company Electrica S.A. announced the obtaining of technical connection approvals to the electricity grid for 17 battery energy storage projects (BESS), with a total capacity of approximately 700 MWh. These approvals represent a crucial step in the development of the projects, confirming the technical solution for connecting to the grid and the associated conditions, thus allowing progress towards design, authorization, and execution.


This achievement marks a significant evolution of the capacity development program announced by Electrica on October 17, 2025, as part of the Electric Strategy 2030, which aims for a production of 1 GW and at least 900 MWh of storage. The General Director of Electrica, Alexandru-Aurelian Chiriță, emphasized that these projects contribute to the security and flexibility of the energy system, accelerating the integration of renewable sources. Electrica intends to put these capacities into operation by the end of 2027, thus strengthening its role in Romania's energy transition.

Sources

sursa imagine
Financial Intelligence
Electrica obține avizele tehnice de racordare pentru 17 proiecte de stocare a energiei electrice, totalizând 700 MWh
sursa imagine
Economica
Electrica accelerează pe stocare: a obținut avize de racordare pentru baterii cu o capacitate de 700 MWh. Vor fi gata la anul

Latest News

23:03

Macron warns that reducing support for Ukraine would impose an unjust peace and pave the way for a new war

22:34

RO-Alert in Tulcea: The Ministry of National Defence detected a new air target east of Snake Island / Two F-16 aircraft took off

22:16

Health Minister Alexandru Rogobete Calls for Coverage of Reconstruction of Both Breasts After Bilateral Mastectomy

21:55

U.S. Army tests autonomous military robots / Vehicles operate in groups and identify targets without GPS

21:16

Canada and the Philippines have concluded negotiations for a free trade agreement, which could enter into force in 2027

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Transelectrica announces an increase in storage capacity to 1,162 MW, but experts warn about costs passed on to consumers
event image
Economy
Transelectrica: The National Electric Power System has exceeded 2,500 MW of production and storage capacities connected to the grid in 2026
event image
Economy
Hidroelectrica is investing RON 296.8 million in a 64 MW battery storage system at Iron Gates II
event image
Current Affairs
The shareholders of Electrica have approved an investment project of 235 million euros for the construction of electricity and thermal energy production facilities in Craiova, including for Ford Otosan.
event image
Current Affairs
Diana Buzoianu announced a battery energy storage program, with a budget of 400 million lei: “It will help lower the price”
event image
Current Affairs
The Electrica Group has signed the contract for the construction of a cogeneration plant in Craiova, which will provide thermal and electric energy.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Electrica SA energy storage electricity

Editor’s Recommendations

main event image
Opinions
13 November 2026, 15:38

Sever Voinescu: Which kind of extremism do you prefer, right-wing or left-wing?

main event image
Exclusive
Yesterday 09:01

SPECIAL "The Efficiency Trap": why Artificial Intelligence promises us free time, but brings us more work and burnout

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol