search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
100 new news items in the last 24 hours
  1. Home
  2. Economy

ANRE proposes increasing the financial guarantee for connecting electrical projects from 5% to 20% of the connection fee, in order to reduce risks and ensure the efficient use of the network.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
6 March 2026, 16:35
main event image
Economy
sursa foto: facebook.com/ ANRE România
google-preference

Always see our news on Google

The National Regulatory Authority for Energy (ANRE) has proposed increasing the value of the financial guarantee for users requesting connection to the grid, from 5% to 20% of the connection fee, in the case of projects with approved capacities greater than 1 MW. This measure aims to increase user accountability, reduce speculative reservations, and ensure efficient use of the capacity of the electrical networks.


ANRE has found that the current guarantee does not sufficiently filter projects, and many of them block the network from advancing. Additionally, the president of ANRE mentioned that the connection regulation will be revised and the extension of technical connection approvals will be conditioned on proof of the financial capacity of investors. Prime Minister Ilie Bolojan emphasized the need to correct the current situation, in which many speculative projects occupy the capacity of the network, preventing serious new investments.

Sources

sursa imagine
Economica
ANRE crește de 4 ori garanția financiară pentru investitorii din energie care solicită racordarea la rețea. Proiect de ordin
sursa imagine
Profit.ro
După tirada lui Bolojan despre ″desființarea ATR-urilor speculative″, ANRE înăsprește normele avizelor de racordare. Principala măsură: majorarea de 4 ori a garanțiilor

Latest News

08:55

The violent storms in the south of the country caused destruction in Călărași County, where trees were uprooted, and a waterspout formed on the coast.

08:46

EXCLUSIVE | August 28, 2026. Trends in online searches / last 24 hours

08:28

When will Nicușor Dan appoint a new prime minister: The President of Romania announced new consultations with the parties starting from September 1

08:14

BIAS 2026, one of the largest air shows in Romania, starts today at Baneasa Airport. The event program and the participating aircraft.

08:03

Nicușor Dan: "It is a matter of weeks, two weeks, three weeks, until the hydrologists say that we will have enough water to start at least one of the reactors in Cernavodă."

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
ANRE changes the legislation regarding energy communities, requiring suppliers to notify consumers when 80% of the estimated monthly consumption is reached.
event image
Current Affairs
ANRE has approved a new mechanism for flexibility in consumption, through which consumers can be compensated for temporarily reducing their electricity consumption.
event image
Economy
ANRE proposes a new system for resolving complaints from energy and gas customers. Suppliers will be classified by colors based on complaints.
event image
Current Affairs
ANRE has decided to withdraw the license of the supplier Grenerg for repeated violations, including the migration of customers without consent.
event image
Current Affairs
ANRE will file an appeal against the decision of the Court of Appeal to suspend the withdrawal of Grenerg's license, accusing the supplier of abuses in the transfer of consumers.
event image
Current Affairs
Bolojan: Prosumer with storage systems can significantly support the energy system / "One of the mistakes that were made was that we did not stimulate the storage area"
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
ANRE electrical projects risks

Editor’s Recommendations

main event image
Current Affairs
Yesterday 20:38

A commercial ship caught fire in the Black Sea. Nicușor Dan: It was hit and seems to have sunk.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
52 minutes ago

Nicușor Dan: "It is a matter of weeks, two weeks, three weeks, until the hydrologists say that we will have enough water to start at least one of the reactors in Cernavodă."

Sources
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol