search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
84 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Failure at the Cernavodă power plant: one of the units has been disconnected from the grid due to a malfunction.

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
4 May 2026, 21:04
main event image
Current Affairs
Inquam Photos / George Călin
google-preference

Always see our news on Google

Nuclearelectrica announced that Unit 2 of the Cernavodă NPP was automatically disconnected from the grid on May 4, 2026, due to a malfunction in an electrical separator in the conventional part of the unit.


According to the statement sent to the Stock Exchange, the disconnection was carried out under safety conditions, with all systems of the unit operating as designed. Nuclearelectrica emphasized that this disconnection does not affect the nuclear safety of the reactor, personnel, the population, or the surrounding environment. After the disconnection, energy production in hydroelectric plants increased rapidly, now accounting for more than half of the national production, followed by coal and gas plants.


Nuclearelectrica will issue a statement upon the reconnection of Unit 2 to the National Energy System.

Sources

sursa imagine
Economica
Avarie la centrala de la Cernavodă. Una dintre unități s-a deconectat de la rețea, defecțiune la partea clasică
sursa imagine
Agerpres
Unitatea 2 a CNE Cernavodă s-a deconectat automat de la rețea luni seara

Latest News

22:00

The European Union intensifies operations against Russia's phantom fleet.

21:10

"I will be hanged if I do not conquer Donbas". Putin fears for his life because of the war in Ukraine.

20:18

Poland intercepted a Russian reconnaissance aircraft over the Baltic Sea, 30 km from the coast.

19:58

Romania participated in the evacuation of five sick children from Gaza Strip, together with members of their families, as part of the 12th humanitarian operation.

19:37

Ropharma reports a net profit of 5.7 million lei, an increase of 627% compared to last year.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNE Cernavodă has decided to keep Unit 2 operational, after analyzing the operating parameters.
event image
Current Affairs
Unit 1 of the Cernavodă Nuclear Power Plant has been reconnected to the National Energy System
event image
Current Affairs
Nuclearelectrica: The company will communicate the operational decisions for reconnecting the reactors at CNE Cernavodă to the National Energy System based on forecasts.
event image
Current Affairs
Unit 2 of the Cernavodă NPP will be shut down in a controlled manner due to the low flow of the Danube.
event image
Current Affairs
The Cernavodă Nuclear Power Plant has initiated the technical procedures for the controlled shutdown of Unit 2. The Rovinari 4 energy group of the Oltenia Energy Complex will be taken out of reserve to compensate for production.
event image
Current Affairs
The nuclear power plant in Cernavodă will be completely shut down today. Romania will rely on energy imports.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
cernavoda nuclear power plant disconnection Nuclearelectrica fault

Editor’s Recommendations

main event image
Opinions
15 hours ago
Editorials and opinions

Do the math…

main event image
Exclusive
5 hours ago

SPECIAL Informat.ro / International security agenda: the topics that dominated the week and those that gained attention

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol