search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
133 new news items in the last 24 hours
  1. Home
  2. Current Affairs
1 hour ago

Turceni Power Plant shut down again after a failure at Unit 5

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
27 October 2026, 09:35
main event image
Current Affairs
Turceni / FOTO: Shutterstock
google-preference

Always see our news on Google

The Turceni Thermal Power Plant was shut down again on Tuesday after a failure in the boiler of generating unit 5, the only unit still operating at the Oltenia Energy Complex power plant. The fault was detected around 5:00 a.m., and the unit was shut down approximately three hours later.

According to information in the local press, the boiler failed again in the evaporator area. Repairs could be completed by the end of the week. The unit has an installed capacity of 285 megawatts, so its shutdown temporarily suspends electricity production at the Turceni Thermal Power Plant.

Unit 5 has been affected by several unexpected shutdowns in recent months, including in August, September, and October. The problems were associated with cracks and ruptures in the boiler, caused by the wear and tear of the equipment and erosion produced over time by coal use. The unit was reconnected to the National Energy System on October 9, after a similar failure.

In August 2026, the Government approved keeping it temporarily available until the end of the first quarter of 2028, in the context of restructuring the energy sector.

Context: Turceni 5 was shut down and recently restarted, while Romania was calling for a postponement of the closure due to the energy crisis

Before Tuesday’s shutdown, unit 5 at the Turceni Power Plant had been shut down on Thursday morning, at 1:00 a.m., due to sealing problems with the water-air boiler, and the management of the Oltenia Energy Complex decided to stop it for repairs. Restarting was estimated for Monday, around 15:00, after the completion of the work.

On Monday, production at Turceni 5 resumed in the afternoon (starting at 15:00), and the Ministry of Energy justified keeping the unit operational, including in relation to the PNRR commitments, citing the need for energy system stability and the fact that coal stocks are available for peak periods. At the same time, Romania notified the European Commission that it had entered a „crisis situation” and requested an assessment of the available capacities and the postponement of the closure of Turceni’s lignite-fired unit 5.

Sources

sursa imagine
Adevarul
Termocentrala Turceni se oprește, din nou, în plină criză energetică. O avarie a scos din funcțiune grupul 5
sursa imagine
Antena3
Avarie la Termocentrala Turceni. Un cazan s-a fisurat și singurul grup energetic funcțional a fost oprit
sursa imagine
Libertatea
Termocentrala Turceni, oprită din nou în plină criză energetică, din cauza unei avarii
sursa imagine
Digi24
Singurul grup funcțional de la Termocentrala Turceni a fost oprit din nou, după o avarie la cazan

Latest News

12:55

Transitional national aid for farmers could also be granted after 2027

12:55

Romania's Chamber of Commerce and Industry: Industry is the most profitable sector in the 2026 National Top of Companies

12:50

An employee of the National Public Security Inspectorate of the Republic of Moldova was detained for corruption and influence peddling following searches ordered in a criminal case

12:42

A politician from Slatina was detained after firing a gun at police officers who had arrived to carry out searches

12:40

The Netherlands withdraw from Eurovision 2027 / National public broadcaster NPO cites debates surrounding Israel’s participation

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Turceni power plant, shut down due to a technical malfunction
event image
Politics
The former Minister of Energy, Bogdan Ivan, announces that the Turceni power plant will be restarted today.
event image
Current Affairs
The Ministry of Energy has announced the resumption of production at the Turceni 5 and Rovinari 4 groups: "The group at Turceni produces more value than any penalties we could pay through target 119 of the PNRR"
event image
Current Affairs
Romania has notified the European Commission that it has entered a crisis situation regarding energy and is requesting a postponement of the closure of the coal-fired power plants in Turceni.
event image
Current Affairs
The Romanian government has decided to extend the operation of the lignite power plants in Turceni and Craiova.
event image
Current Affairs
The Cernavodă Nuclear Power Plant has initiated the technical procedures for the controlled shutdown of Unit 2. The Rovinari 4 energy group of the Oltenia Energy Complex will be taken out of reserve to compensate for production.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Romania Romanian Government oltenia energy complex National Energy System electricity

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

Nicușor Dan, after the SRI uncovered a Russian sabotage network involved in starting the fire at Carfil / “Such actions are unacceptable and constitute a serious violation of our country’s sovereignty and security”

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+5
main event image
Opinions
3 hours ago
Editorials and opinions

Intensification of Russian anti-Romanian active measures

main event image
Exclusive
3 hours ago
Original Content

October 27, 2026. TV: What was discussed last night on the news television channels

main event image
Exclusive
2 hours ago

ANALYSIS Three empires, one target: how the US, Russia, and China are testing the cohesion of the European Union

main event image
Exclusive
4 hours ago
Original Content

EXCLUSIVE | October 27, 2026. Online search trends / last 24 hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol