search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
78 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Group 4 at Rovinari will come into operation to reduce electricity imports.

Medeea Stănescu
whatsapp
facebook
linkedin
x
copy-link copy-link
17 August 2026, 14:35
main event image
Current Affairs
Cristian Bușoi / FOTO: Inquam Photos / Diana Oros
google-preference

Always see our news on Google

The Secretary of State in the Ministry of Energy, Cristian Bușoi, stated that group 4 at the Rovinari coal-fired power plant will resume operations to reduce energy imports, in the context of increased consumption and high temperatures. Almost 300 megawatts will enter the National Energy System, contributing to supply security.

Bușoi mentioned that the weekend was stable from an energy perspective, with consumption below 6,000 megawatts. Wind production was good, but photovoltaic energy cannot cover demand during peak hours.

He also emphasized that coal stocks are sufficient for this week.

Regarding unit 2 at Cernavodă, Bușoi warned that drought and low Danube flow keep the unit closed.

Bușoi mentioned that large energy consumers are looking for solutions to reduce consumption during peak hours, and data indicates a decrease in consumption compared to initial estimates.

Sources

sursa imagine
Digi24
Măsură de urgență în sistemul energetic: Grupul 4 de la Rovinari va intra în funcțiune. Bușoi: "Suntem acoperiți de stocuri de cărbune
sursa imagine
Ziare.com
Grupul 4 de la Rovinari va fi pornit în această seară, pentru a reduce importurile de curent. Unitatea produce cât jumătate de reactor de la Cernavodă
sursa imagine
Hot News
O unitate de la Rovinari va fi pornită ca să compenseze producția de la Cernavodă. Ce probleme pot fi

Latest News

23:03

MFA warns Romanians: Belgium’s national strike suspends nearly all flights

22:45

Valeriu Stoica: “Administrative-territorial reform is more than a trial by fire”

22:35

Ilie Bolojan: “Romania has more state employees than it can afford”

22:20

Explosion aboard a Russian ship in the Libyan port of Benghazi

22:02

Iran announces missile and drone attacks on U.S. bases in Bahrain

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Restarting Reactor 1 at Cernavodă does not mean that we will pay lower energy bills. Explanation given by Ciprian Cherciu
event image
Current Affairs
The Cernavodă reactors could be restarted only toward the end of September
event image
Current Affairs
The Cernavodă nuclear power plant could remain shut down in November, while costly imports could drive up Romanian consumers’ bills
event image
Current Affairs
Secretary of State at the Ministry of Energy Cristian Bușoi: The two reactors at Cernavodă could be restarted only around mid-October, if the level of the Danube allows it
event image
Economy
The energy minister announces that the shutdown of Cernavodă Unit 1 will be offset by new production capacity
event image
Current Affairs
The Secretary of State in the Ministry of Energy, Cristian Bușoi, announces that restarting the Cernavodă Nuclear Power Plant depends on an increase in the Danube’s flow rate and the specialists’ decision / “We cannot risk the pumps being damaged”
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Rovinari Thermal Power Plant Cristian Busoi Energy

Editor’s Recommendations

main event image
Opinions
21 November 2026, 19:08

Sever Voinescu: The Misadventures of a Press Conference

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol