search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
139 new news items in the last 24 hours
  1. Home
  2. Current Affairs
3 hours ago

Owners of buildings constructed without authorization have one year to apply for their legalization, according to the new Territorial Planning Code.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
13 August 2026, 12:34
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The new Code of Territorial Planning, Urbanism and Constructions (CATUC) provides a transitional period of a maximum of one year for owners of buildings constructed without authorization or in violation of it, to request legalization.

The Minister of Development, Cseke Attila, announced that after the expiration of this term, regularization will only be possible under certain conditions, and local authorities will be able to initiate demolition procedures. The regularization authorization will not be automatic and will require compliance with urban planning regulations and quality requirements.

After one year, regularization will only be allowed for certain types of buildings, such as single-family homes and household annexes. Additionally, the costs for regularization will be significantly higher during the transitional period, and the tax on unauthorized buildings will be increased by 100%.

Local authorities will be able to demolish unlegalized buildings after the deadline, and the expenses will be recovered from the owners. Compliance with authorization procedures remains essential for the safety of buildings.

Sources

sursa imagine
Digi24
Construcțiile fără autorizație vor putea intra în legalitate într-un an. Ce se întâmplă după expirarea termenului
sursa imagine
Timis Online
Fără autorizații pentru unele lucrări. Ce se schimbă pentru români odată cu noul Cod al Construcțiilor
sursa imagine
B1TV
Reguli noi pentru autorizarea anumitor construcții. Lucrările care pot fi făcute doar cu notificarea primăriilor
sursa imagine
Ziare.com
Termen limită pentru intrarea în legalitate a construcțiilor realizate fără autorizație. Care este perioada tranzitorie, potrivit noului Cod al urbanismului
sursa imagine
Stirile ProTV
Construcţiile fără autorizaţie au un termen-limită pentru intrarea în legalitate. Anunțul făcut de ministrul Dezvoltărlii

Latest News

17:43

Japan summoned the Russian ambassador to protest against Vladimir Putin's visit to the Kuril Islands.

17:43

Arab national football federation leaders have publicly declared their support for Gianni Infantino in the context of the crisis within the global body.

17:39

During the Combined Resolve military exercise in Germany, Ukrainian drone operators defeated American forces

17:30

Gheorghie Vlad, the Chief of the General Staff of Defense, met with his Hungarian counterpart to discuss regional security.

17:20

The Finnish government will provide Ukraine with 28.5 million euros for the reconstruction of the energy sector affected by Russian attacks.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The new Land Development Code comes into force on August 25 and allows the construction of annexes in rural areas without a building permit, while respecting local regulations.
event image
Politics
The Chamber of Deputies has adopted the Urbanism Code / Cseke Attila: "It brings substantial simplifications in the field of construction"
event image
Current Affairs
The Parliament has adopted the new Urbanism Code, which simplifies construction procedures and reduces bureaucracy. The transfer of the powers to issue permits will take place from 2028.
event image
Current Affairs
The Senate has adopted the Territorial Planning, Urbanism and Constructions Code, which will digitalize the approval of constructions and reduce bureaucracy.
event image
Politics
Building owners notified by authorities who do not carry out rehabilitation work may be fined amounts between 5,000 and 8,000 lei.
event image
EU
The European Commission is looking to establish rules that delay the construction of housing and increase project costs.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Construction legalization unauthorized constructions the new code

Editor’s Recommendations

main event image
Current Affairs
49 minutes ago

The Ministry of Energy announces that the National Electric Power System is stable, despite the shutdown of the reactors at Cernavodă. Romania will import up to 2,300 MW to cover the energy needs.

Sources
imagine sursa
imagine sursa
main event image
International
2 hours ago

The crisis in Central and Southeastern Europe affects Germany and France, with energy prices increasing by 20%-25%.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
1 hour ago

The third RO-Alert message in Tulcea. Residents are advised to take shelter.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
3 hours ago

ANALYSIS Cernavodă, the test of Romania's unpreparedness: the drought that exposes the lack of adaptation of the energy system

main event image
Opinions
7 hours ago

Andrei Pleșu: Memories about Trabant

main event image
Exclusive
4 hours ago
Original Content

EXCLUSIVE The top themes in domestic politics in trends, in the last week

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol