search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
162 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Owners of buildings constructed without authorization have one year to apply for their legalization, according to the new Territorial Planning Code.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
13 August 2026, 12:34
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The new Code of Territorial Planning, Urbanism and Constructions (CATUC) provides a transitional period of a maximum of one year for owners of buildings constructed without authorization or in violation of it, to request legalization.

The Minister of Development, Cseke Attila, announced that after the expiration of this term, regularization will only be possible under certain conditions, and local authorities will be able to initiate demolition procedures. The regularization authorization will not be automatic and will require compliance with urban planning regulations and quality requirements.

After one year, regularization will only be allowed for certain types of buildings, such as single-family homes and household annexes. Additionally, the costs for regularization will be significantly higher during the transitional period, and the tax on unauthorized buildings will be increased by 100%.

Local authorities will be able to demolish unlegalized buildings after the deadline, and the expenses will be recovered from the owners. Compliance with authorization procedures remains essential for the safety of buildings.

Sources

sursa imagine
Digi24
Construcțiile fără autorizație vor putea intra în legalitate într-un an. Ce se întâmplă după expirarea termenului
sursa imagine
Timis Online
Fără autorizații pentru unele lucrări. Ce se schimbă pentru români odată cu noul Cod al Construcțiilor
sursa imagine
B1TV
Reguli noi pentru autorizarea anumitor construcții. Lucrările care pot fi făcute doar cu notificarea primăriilor
sursa imagine
Ziare.com
Termen limită pentru intrarea în legalitate a construcțiilor realizate fără autorizație. Care este perioada tranzitorie, potrivit noului Cod al urbanismului
sursa imagine
Stirile ProTV
Construcţiile fără autorizaţie au un termen-limită pentru intrarea în legalitate. Anunțul făcut de ministrul Dezvoltărlii

Latest News

12:37

Exclusion of Great Britain from the “Made in Europe” plan threatens the British automotive industry

12:33

Prince Harry could make a documentary about Princess Diana

12:20

Actor Ionut Antonie has died at the age of 59. He was at risk of being buried as an unclaimed person / “We managed to find one of Ionuț’s relatives.”

12:05

Remus Ștefureac (INSCOP): Romanians are adapting their decisions to a prolonged economic crisis

12:04

The Commission proposes unlocking €4.2 billion for Hungary and restoring the targeted universities’ access to Erasmus+ and Horizon Europe

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The new Land Development Code comes into force on August 25 and allows the construction of annexes in rural areas without a building permit, while respecting local regulations.
event image
Current Affairs
The new Code of land planning, urbanism, and constructions will come into force on August 25, unifying the legislation in the field.
event image
Politics
The Chamber of Deputies has adopted the Urbanism Code / Cseke Attila: "It brings substantial simplifications in the field of construction"
event image
Current Affairs
The Ministry of Development has adopted the new Territorial Planning Code, which aims to increase the safety of constructions and the integration of sustainability in urban planning.
event image
Current Affairs
The Parliament has adopted the new Urbanism Code, which simplifies construction procedures and reduces bureaucracy. The transfer of the powers to issue permits will take place from 2028.
event image
Current Affairs
The Senate has adopted the Territorial Planning, Urbanism and Constructions Code, which will digitalize the approval of constructions and reduce bureaucracy.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Construction legalization unauthorized constructions the new code

Editor’s Recommendations

main event image
INSCOP Surveys
1 hour ago

Newmoney.ro – INSCOP Economic Sentiment Index - 2nd Edition, September 2026 | 86.1% of Romanians believe that prices will increase in the next six months / 11.3% of Romanians state that they intend to buy a home in the next six months

main event image
Politics
14 minutes ago

Siegfried Mureșan announced the priorities of the governing program and promises that there will be no increases in taxes and duties during the term: There will be three deputy prime ministers

main event image
Politics
47 minutes ago

Meeting between Sorin Grindeanu and Ilie Bolojan to discuss the Mureșan government / How the discussions would have unfolded

Sources
imagine sursa
imagine sursa
main event image
Exclusive
54 minutes ago

EXCLUSIVE Monitorul Miniștrilor by NewsVibe: September 17–23, 2026 / Alexandru Nazare, on the offensive in New York for the country’s financial credibility

main event image
Politics
54 minutes ago

Daniel Dăianu calls for the rapid formation of a government and warns that snap elections would mean “playing with fire”

Sources
imagine sursa
main event image
Politics
1 hour ago

Kelemen Hunor, after Siegfried Mureșan presented the UDMR governing program: “There are no extravagant things” / What he says about the chances of bringing the PSD into the government

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
2 hours ago
Original Content

September 23, 2026. TV: What was discussed last night on the news channels

main event image
Current Affairs
1 hour ago

An iron bridge in Bacău County broke after a truck crossed it. Traffic was redirected

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol