search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
163 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Bogdan Ivan announces that the energy group number 4 at the Rovinari Power Plant has started to produce energy for the National Energy System.

Emese Grancsa
whatsapp
facebook
linkedin
x
copy-link copy-link
17 August 2026, 20:57
main event image
Current Affairs
Credit foto: shutterstock.com
google-preference

Always see our news on Google

The former Minister of Energy announced on Facebook that the energy group number 4 at the Rovinari Power Plant has started producing energy for the National Energy System starting at 14:30. He emphasized the importance of this achievement, stating that the energy produced in the country contributes to the security of the energy system, to the economy, and to the well-being of Romanians.

Ivan mentioned that the equipment has been put back into operation without issues, and that each production capacity is essential in the context of the current energy crisis. He also promised support for maintaining the activity of three groups at Rovinari and one at Turceni, highlighting collaboration with PSD and C.E. Oltenia. The dismissed Prime Minister Ilie Bolojan previously announced that the deficit of electricity generated by the disconnection of the nuclear power plant at Cernavodă will be compensated from various sources, including by activating the reserve group at Rovinari.

Sources

sursa imagine
News.ro
Bogdan Ivan, după repornirea Grupului 4 de la Termocentrala Rovinari: Fiecare capacitate de producţie contează, iar energia produsă aici, în ţară, înseamnă mai multă siguranţă pentru sistem, pentru economie şi pentru români
sursa imagine
DCNews
România se întoarce la energia pe cărbuni în plină criză energetică. Chirieac: Statul nu și-a făcut treaba cu stocarea
sursa imagine
Mediafax
România crește capacitățile energetice. Grupul 4 de la Rovinari va fi repornit. Reacția PSD

Latest News

23:52

The Romanian Naval Forces, in cooperation with NATO allies, are conducting monitoring missions in the Black Sea this week

23:31

Ludovic Orban criticizes Nicușor Dan for delaying the report on the annulment of the 2024 presidential election: “He is only giving ammunition to the trumpets of Russian propaganda”

23:01

Slovakia will not contribute to the EU’s €45 billion loan for Ukraine

22:35

Steven Spielberg to direct his first western / The film will star Cillian Murphy and Jessie Buckley

22:09

The hacker who attacked Rockstar, Uber, and Revolut and stole images from GTA 6 has been sentenced to seven years in prison

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Prime Minister Luca Niculescu announces the restart of Unit 1 and calls for the Bala 2 project to be expedited
event image
Current Affairs
Unit 2 of the Cernavodă Nuclear Power Plant has entered the start-up sequence / Commissioning is estimated for Tuesday
event image
Economy
The energy minister announces that the shutdown of Cernavodă Unit 1 will be offset by new production capacity
event image
Current Affairs
Restarting Reactor 1 at Cernavodă does not mean that we will pay lower energy bills. Explanation given by Ciprian Cherciu
event image
Politics
Ilie Bolojan announced the resumption of works at the Iernut power plant, with an estimated completion by the end of 2026.
event image
Current Affairs
Cernavoda Unit 1 has been resynchronized / The plant is gradually returning to nominal output
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Rovinari Thermal Power Plant bogdan ivan electricity

Editor’s Recommendations

main event image
Politics
Yesterday 21:31

Ludovic Orban criticizes Nicușor Dan for delaying the report on the annulment of the 2024 presidential election: “He is only giving ammunition to the trumpets of Russian propaganda”

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol