search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
167 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Corporate Tram is conducting tests on Line 5 in Bucharest, but traffic has not been opened. The tests continue without a set date for the resumption of transport.

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
22 December 2025, 16:27
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The Corporations Tram, which runs on Line 5 in Bucharest, is currently in the testing phase, but it is not carrying passengers. Although the modernization works were completed in November, the service has not been opened. Recent images from December 22 show the trams testing the new infrastructure, but without stopping for passengers. The first tests took place on November 28, and additional tests were conducted to check the operation of the electrical systems and the track. It seems that more time is needed to ensure the necessary electrical supply for the operation of the trams with passengers. Line 5 has been closed since 2017 for modernization, and the date for resuming service remains unspecified by the authorities.

Sources

sursa imagine
B365
FOTO | „Tramvaiul Corporatiștilor” circulă pe traseu, dar doar în probe. Rămâne un mister când se va deschide circulația pe Linia 5 din București
sursa imagine
Gandul
Linia 5 de tramvai: se mai deschide anul acesta? "Îl așteaptă pe Ciprian Ciucu"
sursa imagine
B365
De ce rămâne în depou Tramvaiul Corporatiștilor, deși promisiunea era să fie pe din nou pe șine de mâine. Întârzierile de la Linia 5

Latest News

16:00

Greek companies have invested over 5.5 billion euros in Romania’s energy sector

15:58

Dominic Fritz has officially left the position of mayor of Timișoara: “Thank you, Timișoara. Serving you remains the honor of my life”

15:58

Politico: The Trump administration excludes the United Kingdom, France, and the Baltic states from a NATO meeting on the future of the Alliance

15:57

AnimaWings suspends all flights, one day after filing for insolvency

15:53

Benjamin Netanyahu claims that Israel warned Britain about an alleged Iranian attack on RAF Fairford base

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest: The rehabilitation works of the tram tracks on Armand Călinescu street have been suspended due to the discovery of possible archaeological remains.
event image
Current Affairs
Ciprian Ciucu announced the start of the installation works for the tram line under the Constanța Bridge, with an estimated completion in three weeks.
event image
Current Affairs
The Traffic Police Brigade announces restrictions on Theodor Pallady Boulevard to allow work on the tram line to continue
event image
Current Affairs
STB resumes tram services on Basarab Overpass and changes the routes of several lines
event image
Economy
The Pro Infrastructura Association is calling on CFR to reopen the Cluj-Napoca–Poieni railway line in 2027, with work 80% complete
event image
Current Affairs
Railway traffic on the Lugoj - Timișoara Est section is reopening after nearly three months of modernization works.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
tram line 5 STB

Editor’s Recommendations

main event image
International
2 hours ago

Student protests in France are escalating: hundreds of high schools are blocked. Prime Minister Sébastien Lecornu has convened a crisis unit / A high school in Nantes was set on fire during the demonstrations

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
5 hours ago

Andrei Pleșu: The Romanian Independent

main event image
Exclusive
6 hours ago

EXCLUSIVE Ranking of domestic politics topics trending over the past week

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol