search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
159 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Corporate Tram is conducting tests on Line 5 in Bucharest, but traffic has not been opened. The tests continue without a set date for the resumption of transport.

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
22 December 2025, 16:27
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The Corporations Tram, which runs on Line 5 in Bucharest, is currently in the testing phase, but it is not carrying passengers. Although the modernization works were completed in November, the service has not been opened. Recent images from December 22 show the trams testing the new infrastructure, but without stopping for passengers. The first tests took place on November 28, and additional tests were conducted to check the operation of the electrical systems and the track. It seems that more time is needed to ensure the necessary electrical supply for the operation of the trams with passengers. Line 5 has been closed since 2017 for modernization, and the date for resuming service remains unspecified by the authorities.

Sources

sursa imagine
B365
FOTO | „Tramvaiul Corporatiștilor” circulă pe traseu, dar doar în probe. Rămâne un mister când se va deschide circulația pe Linia 5 din București
sursa imagine
Gandul
Linia 5 de tramvai: se mai deschide anul acesta? "Îl așteaptă pe Ciprian Ciucu"
sursa imagine
B365
De ce rămâne în depou Tramvaiul Corporatiștilor, deși promisiunea era să fie pe din nou pe șine de mâine. Întârzierile de la Linia 5

Latest News

23:05

Ilie Bolojan accuses Alexandru Rogobete of being "one of the arsonists" of the health strike.

22:40

University of Craiova, eliminated from the Champions League qualifiers after 2-2 with Levski Sofia

22:27

MIPE provided clarifications regarding the request for a service apartment from Dragoș Pîslaru

22:05

The Court of Cassation of France rejects the appeal of Paul of Romania and approves his handover to Romania

21:51

Ilie Bolojan, call to Romanians to reduce energy consumption during peak hours after the shutdown of the reactors at Cernavodă

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The subway circulation is interrupted between the 1 Mai and Jiului stations. Metrorex announces a technical problem.
event image
Current Affairs
STB announces changes on several public transport lines in Bucharest, including tram 44 and seven bus lines
event image
Current Affairs
Trams of line 27 will resume circulation on the main route on Calea Dudești and Bulevardul Camil Ressu, and line 116 will be extended to Gara Progresul.
event image
Current Affairs
An accident between two cars and a tram occurred in Bucharest, blocking the tram traffic.
event image
Current Affairs
A tram of line 25 derailed on Preciziei Boulevard after being hit by a truck that was reversing.
event image
Current Affairs
The Bucharest City Hall will buy between 79 and 100 new trams to improve the transport network and extend the line from Prelungirea Ghencea.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
tram line 5 STB

Informat Diaspora

main event image
Diaspora
Yesterday 12:28

Young Romanians in Italy are becoming increasingly interested in job opportunities in Romania

Sources
imagine sursa

Editor’s Recommendations

main event image
Current Affairs
Yesterday 17:07

Unit 2 of the Cernavodă NPP will be shut down in a controlled manner due to the low flow of the Danube.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
main event image
Opinions
Yesterday 10:27

Political risk analysis. Episode 1

main event image
Current Affairs
Yesterday 20:05

The Court of Cassation of France rejects the appeal of Paul of Romania and approves his handover to Romania

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+3
main event image
Exclusive
Yesterday 12:30
Original Content

Exclusively the Ministers' Monitor by NewsVibe: July 22-28, 2026

main event image
Exclusive
Yesterday 09:22

ANALYSIS / Brexit, ten years later: the event that rekindled the European dream of the British

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol