search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
59 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Alive Renewable Holding, a subsidiary of Premier Energy, has acquired 90% of a photovoltaic park project in Buzău.

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 December 2024, 20:03
main event image
Current Affairs
foto: Ingrid Balabanova / Panthermedia / Profimedia
google-preference

Always see our news on Google

The subsidiary Premier Energy, indirectly controlled by Czech businessman Jiri Smejc, has acquired 90% of the photovoltaic park project developed by Development Power Solar Energy SRL. The project, located in the commune of Stâlpu, Buzău county, is equipped with an energy storage facility. It is included in the Ministry of Energy's database for receiving EU state subsidies through the PNRR.

Sources

sursa imagine
Profit.ro
Tranzacție: Premier Energy a cumpărat 90% din dezvoltatorul unui proiect de parc fotovoltaic, la care nepotul premierului și liderului PSD Marcel Ciolacu deținea 50%
sursa imagine
Hot News
Nepotul lui Ciolacu a finalizat vânzarea afacerii cu energie eoliană, după ce a obținut fonduri PNRR. Cumpărătorul este firma unui mare mogul ceh - HotNews.ro
sursa imagine
Economica
Premier Energy a cumpărat parcul fotovoltaic dezvoltat și de nepotul lui Ciolacu, care ar urma să primească bani din PNRR - Economica.net

Latest News

08:05

After S&P: Romania, where to?

08:01

Formula 1: Max Verstappen wins the first race of the 2026 season for Red Bull. Antonelli finishes in second place, while Hamilton completes the podium

07:56

A new drone detected by the Romanian Ministry of National Defence’s radars at Romania’s border. Two Spanish F-18 aircraft took off

07:45

Nations League: Portugal secures its place in the quarter-finals / Sunday’s results

07:44

The US is withdrawing its bombers from the British RAF Fairford air base, which was targeted by an alleged terrorist attack

See more news

NEWS ON THE SAME TOPICS

event image
Politics
Ilie Bolojan announces €650 million in funding for photovoltaic panels and storage systems intended for public institutions
event image
Current Affairs
Simtel Team announces the completion of the PNRR funding settlement for the photovoltaic park in Giurgiu / The company contests the settled amount.
event image
Current Affairs
Solar Lady, the largest solar power plant in Europe, has received the establishment authorization from ANRE for the first phase of the project.
event image
Current Affairs
The Valtryp company from Oradea fully delivers in the national system the energy generated by its own photovoltaic park.
event image
Current Affairs
Bolojan: Prosumer with storage systems can significantly support the energy system / "One of the mistakes that were made was that we did not stimulate the storage area"
event image
Economy
MVM Energie Romania has received ANRE authorization for the development of a photovoltaic park in Covasna. The project will be carried out on 20 hectares.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Premier Energy acquisition Buzău

Editor’s Recommendations

main event image
Politics
33 minutes ago

Nicuşor Dan is once again summoning the parties for consultations on appointing the prime minister. The president is expected to announce today the fourth name since the political crisis began

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+5
main event image
International
54 minutes ago

Milorad Dodik’s ally wins a seat in the tripartite presidency of Bosnia and Herzegovina, according to partial results announced on Sunday

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
International
1 hour ago

Flavio Bolsonaro leads Lula da Silva after the partial vote count in the first round of Brazil’s presidential election

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Opinions
3 October 2026, 21:31

Sever Voinescu: The Muses of the (半)God-Farmer

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol