search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
137 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Prime Batteries Technology, controlled by Adrian Polec, will build a new factory in Cernica and another one in Fundulea to increase the production capacity of lithium-ion batteries

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
5 May 2025, 11:38
main event image
Current Affairs
foto:shutterstock
google-preference

Always see our news on Google

Romanian lithium-ion battery manufacturer Prime Batteries Technology, founded by Adrian Polec, will build a new factory next to its existing plant in Cernica and another one in Fundulea, following a €700 million investment. These expansions are aimed at increasing production capacity and introducing new technological processes, such as painting. The company, which has reported a turnover of €41.3 million in 2023, is collaborating with major industry players and aims to reach a production capacity of 8 GWh by 2026.

Sources

sursa imagine
Profit.ro
EXCLUSIV Prime Batteries mai ridică o fabrică în Cernica și pregătește o investiție gigant în Fundulea. Lansează și o baterie nouă
sursa imagine
Fanatik
Gigantul care se pregătește să deschidă o nouă fabrică în România. Vor fi disponibile noi locuri de muncă, iar investiția e una uriașă
sursa imagine
Romania TV
O mare companie greacă deschide o fabrică în România. Investiţii majore şi noi locuri de muncă
sursa imagine
Stiripesurse
Fabrica viitorului se construiește în România. Gigantul care aduce o investiție uriașă și noi de locuri de muncă
sursa imagine
EVZ.ro
Investiție colosală. O nouă fabrică în România creează sute de locuri de muncă - Evenimentul Zilei

Latest News

23:14

The mayor of Iași announced the cessation of street lighting at night due to the energy crisis. The measure will save approximately 10 MWh per night.

22:41

A SpaceX rocket out of control will crash on the Moon, forming a 27-meter crater.

22:01

Greece is facing new wildfires. A suburb of Athens has already been evacuated.

21:26

Traian Băsescu: Bolojan needs to rebuild the coalition with PSD for the good of the country

21:05

The Romanian Army has been mobilized to protect the operation of the Cernavodă Nuclear Power Plant, carrying out hydrographic measurements on the Danube.

See more news

NEWS ON THE SAME TOPICS

event image
EU
The European Commission approves a joint venture for batteries in Romania, Bulgaria, and Italy
event image
International
The Hungarian government warns companies in the electric vehicle battery industry that units that do not meet environmental standards risk closure.
event image
Economy
Enevo Group and Kraftfeld are building a 220 MWh energy storage system in Drăgănești-Olt
event image
Economy
KMG International (Rompetrol) launches a project of 8.2 million euros for the development of a network of charging stations for electric vehicles in Romania, co-financed from European funds.
event image
Current Affairs
The European Bank for Reconstruction and Development will provide 44 million euros for a battery energy storage system in Scornicești.
event image
Current Affairs
The Austrian company Enery has started the construction of a hybrid photovoltaic park in Ogrezeni, Giurgiu, with an investment of 460 million euros.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Prime Batteries Technology new factory Cernica investments Construction

Editor’s Recommendations

main event image
EU
Yesterday 15:31

The Commission monitors FIFA's plan for possible violations of European competition rules.

Sources
imagine sursa
main event image
Opinions
Yesterday 15:18

Andrei Cornea: The Fatalist. An X-ray of Conspiracy Theory

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol