search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
65 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Hidroelectrica plans to install a 64 MW battery storage system at the Porțile de Fier II hydropower plant to balance the national power system.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
28 July 2025, 14:39
main event image
Current Affairs
sursa foto: shutterstock.com
google-preference

Always see our news on Google

The state-owned company Hidroelectrica plans to install a battery storage system at the Iron Gates II hydropower plant with a capacity of 64 MW and 256 MWh. The project, estimated at 309.7 million lei, aims to provide balancing services to offset imbalances in the national power system caused by renewable sources. The contract includes all phases from design to commissioning, with a duration of about 2 years, and the award is planned for late fall 2025.

Sources

sursa imagine
Profit.ro
PREMIERĂ Hidroelectrica va instala baterii de stocare de energie pe Dunăre FOTO&DOCUMENT
sursa imagine
Economedia
PREMIERĂ Hidrocentrala Porțile de Fier 2 trece pe baterii. Hidroelectrica va cumpăra și monta unități de stocare energie la turbine pentru 310 milioane lei

Latest News

21:04

The circulation of trucks will be prohibited on Sunday in the counties of Arad, Bihor, and Satu Mare, due to the heatwave.

20:36

WHO Alert: The Ebola epidemic in the Democratic Republic of the Congo is rapidly intensifying, becoming the largest in the country's history.

20:10

Peter Magyar announces exceptional measures in Hungary for managing the energy crisis caused by the drop in the level of the Danube.

19:25

The first leader from PNL to react after the Fitch report: The measures are going in the right direction.

19:05

The United States embassies in the Middle East are issuing security alerts and recommending that American citizens leave the region.

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Enevo Group and Kraftfeld are building a 220 MWh energy storage system in Drăgănești-Olt
event image
Economy
Electrica has obtained the technical connection approvals for 17 electricity storage projects, having a total capacity of 700 MWh
event image
Current Affairs
Hidroelectrica allocates over 4 million lei for the maintenance of the automation systems at the Iron Gates
event image
Current Affairs
The European Bank for Reconstruction and Development will provide 44 million euros for a battery energy storage system in Scornicești.
event image
EU
The European Commission approves a joint venture for batteries in Romania, Bulgaria, and Italy
event image
Economy
Hidroelectrica has signed the contract for the construction of the Tudor Vladimirescu Photovoltaic Power Plant, in Braila County
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hidroelectrica dunare energy storage system batteries iron gates

Editor’s Recommendations

main event image
Exclusive
10 hours ago
Original Content

IT News Review by Control F5 Software: AI cameras can detect phone use while driving

main event image
Education
10 hours ago

QX reforms enter the trial year: major changes in schools, universities, and research in 2026–2027

main event image
Opinions
Yesterday 15:18

Andrei Cornea: The Fatalist. An X-ray of Conspiracy Theory

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol