The state-owned company Hidroelectrica plans to install a battery storage system at the Iron Gates II hydropower plant with a capacity of 64 MW and 256 MWh. The project, estimated at 309.7 million lei, aims to provide balancing services to offset imbalances in the national power system caused by renewable sources. The contract includes all phases from design to commissioning, with a duration of about 2 years, and the award is planned for late fall 2025.
Sources
Latest News
21:04
The circulation of trucks will be prohibited on Sunday in the counties of Arad, Bihor, and Satu Mare, due to the heatwave.
20:36
WHO Alert: The Ebola epidemic in the Democratic Republic of the Congo is rapidly intensifying, becoming the largest in the country's history.
20:10
Peter Magyar announces exceptional measures in Hungary for managing the energy crisis caused by the drop in the level of the Danube.
19:25
The first leader from PNL to react after the Fitch report: The measures are going in the right direction.
19:05
The United States embassies in the Middle East are issuing security alerts and recommending that American citizens leave the region.
See more news