The state-owned company Hidroelectrica plans to install a battery storage system at the Iron Gates II hydropower plant with a capacity of 64 MW and 256 MWh. The project, estimated at 309.7 million lei, aims to provide balancing services to offset imbalances in the national power system caused by renewable sources. The contract includes all phases from design to commissioning, with a duration of about 2 years, and the award is planned for late fall 2025.
Sources
Latest News
11:30
South Korea records a historic high of 42.5°C in Yangsan, the highest temperature since 1904
11:11
The resources of the U.S. Navy are insufficient for the defense of Israel, warns the highest American military official in Europe.
10:49
Russia announces the destruction of 635 Ukrainian drones on the night from Saturday to Sunday
10:27
A strong fire broke out on Sunday morning in a parking lot in Oradea, destroying several cars.
10:09
"The Gardener" and the Sitting Woman: symbols of an advanced Neolithic civilization from Dobrogea
See more news