search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
131 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Energonuclear SA has awarded a contract of 6 million euros for the second phase of the reactors 3 and 4 project at Cernavodă, below the initial estimate.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
26 January 2026, 17:01
main event image
Current Affairs
Foto: Facebook/ e-nergia.ro
google-preference

Always see our news on Google

The company Energonuclear SA has signed a contract of approximately 6 million euros, excluding VAT, for the second phase of the construction project of reactors 3 and 4 at Cernavodă, below the initially estimated value of nearly 8 million euros. Teknosec, the leader of the association, aims to obtain an accurate estimate of costs and the implementation schedule.


After this phase, the final investment will be decided to start the actual construction. Teknosec, established in 2024 and controlled by Canadian citizen Verma Rajan Kumar, aligns with the initiatives of the Ministry of Energy to strengthen the local nuclear energy supply chain. The reactors will add over 1,400 MW to Romania's production capacity, covering the annual consumption for 7 million households. The completion of this project will ensure 30% of the national energy requirement and will reduce costs for consumers.

Sources

sursa imagine
Economica
Reactoarele 3 și 4 de la Cernavodă. O firmă din București, controlată 100% de un canadian, în consorțiu cu RATEN, a câștigat contractul pentru consultanța tehnică
sursa imagine
Gandul
Proiectul reactoarelor 3 și 4 Cernavodă intră în linie dreaptă. Va fi cea mai mare investiție energetică din ultimii 35 de ani
sursa imagine
Profit.ro
DOCUMENT Reactoarele 3-4 Cernavodă: Se așteaptă ATR-ul și oferte de materiale, echipamente și manoperă. Ajutor de stat, terenuri de la Primărie, survol cu drona
sursa imagine
Capital
Reactoarele 3 și 4 de la Cernavodă intră într-o etapă-cheie. EnergoNuclear așteaptă ATR-ul și cere oferte pentru materiale și manoperă

Latest News

22:59

An Indian cargo ship sank in the Red Sea after an attack by Houthi rebels.

22:44

PHG Media Invest is in court against CNA for sanctions applied to Realitatea Plus

22:31

Unit 2 of the Cernavodă Nuclear Power Plant is operating normally under drought conditions.

22:16

Cuba: The UNE Company has announced the restoration of the national electric system, but many areas remain without power.

21:53

The Italian state, required to pay 260,000 euros to a Romanian woman illegally deprived of her liberty.

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Nuclearelectrica: EIB approved a loan of 800 million euros for the modernization of Unit 1 CNE Cernavodă
event image
Current Affairs
Representatives of the Government and AtkinsRéalis Canada discussed the modernization of Unit 1 and the preparation of reactors 3 and 4 at the Cernavodă NPP.
event image
Current Affairs
Nuclearelectrica has completed the first concrete pouring for the modernization of Unit 1 CNE Cernavodă, part of a three-phase project, with an estimated completion in 2027.
event image
Current Affairs
MEP Virgil Popescu announces that the European Commission will redirect 200 million euros through the InvestEU program for the development of small modular reactors (SMR)
event image
Current Affairs
Energy crisis at the nuclear power plant in Cernavodă: The Ministry of Energy estimates the reconnection of Unit 2 in June 2026
event image
Economy
Romanian Electric Networks has launched a tender of up to 387 million lei for works in the high voltage installations in Southern Muntenia, Banat, and Dobrogea.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
contract nuclear reactors Cernavoda

Editor’s Recommendations

main event image
Exclusive
7 hours ago

ANALYSIS Gianni Infantino and the front of discontent: can the head of FIFA be shaken?

main event image
Exclusive
13 hours ago

EXCLUSIVE Romania, Trump and the new Atlantic equation: how much is the bet on a single man worth

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol