The Kazakh-Romanian Energy Investment Fund (FIEKR), through Rompetrol Energy, has completed the reception of works at the cogeneration plant on the Petromidia Năvodari platform, an essential project for modernizing the energy infrastructure in Dobrogea. Starting from December 30, 2025, Rompetrol Energy will exclusively operate the plant, which will ensure a constant flow of energy for the refinery and will be able to direct the surplus into the national grid. The plant, integrated with the refinery and the National Energy System, has already produced 150,000 MWh of electricity and 190,000 tons of technological steam. Final endurance tests have confirmed the optimal functioning of the equipment, and Rompetrol has obtained all the necessary permits. The SGT-750 turbines, which use gas fuel, each generate about 39 MWh of electricity. FIEKR, established in 2018, aims to develop energy projects in Romania.
Sources
Latest News
12:35
A man was detained after allegedly touching a 17-year-old girl on the knee on public transport in Bucharest
12:30
Xi Jinping: Relations between China and Russia “remain stable and trustworthy”
12:28
Iuliu Winkler: “Romania has reached a GDP per capita of 80% of the EU average”
12:22
RO-Alert: Police are searching for a 12-year-old boy from Timișoara who disappeared on his way to school
12:21
Diana Buzoianu calls for the termination of the interim ANM chief’s mandate, citing the expiry of the statutory term and financial irregularities
See more news