search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
120 new news items in the last 24 hours
  1. Home
  2. Politics

Nicușor Dan: "It is a matter of weeks, two weeks, three weeks, until the hydrologists say that we will have enough water to start at least one of the reactors in Cernavodă."

Adrian Rusu
whatsapp
facebook
linkedin
x
copy-link copy-link
28 August 2026, 06:03
main event image
Politics
facebook.com/ Nicușor Dan
google-preference

Always see our news on Google

President Nicușor Dan stated that the risk of some large industrial consumers being affected by the electricity crisis has passed. He mentioned that hydrologists forecast that in a few weeks there will be enough water to restart at least one of the reactors at the Cernavodă power plant. Nicușor Dan frequently discussed the energy alert with interim Prime Minister Ilie Bolojan, emphasizing that the problems of the Romanian energy system are not recent, but the result of a deficient strategy in recent years. The president assured that there are no risks for household consumers, and the disconnection of some large industrial consumers is now unlikely. He acknowledged that Romania has not completed the necessary works for the energy sector on time, but promised that within a year the situation will significantly improve.


"It is a matter of weeks, two weeks, three weeks, until hydrologists say that we will have enough water to start at least one of the reactors at Cernavodă. Then, fortunately, we are interconnected (...) we are interconnected with Ukraine, we are interconnected with Bulgaria, which fortunately has a consistent storage capacity and already the Cernavodă power plant, as long as it has been off for ten days, something like that, and we managed to operate all of us," said President Nicușor Dan on Thursday evening in Chișinău.

Sources

sursa imagine
Ziare.com
Nicușor Dan anunță când va putea fi reconectat cel puțin un reactor de la Cernavodă. "O să reușim să trecem de criza asta
sursa imagine
News.ro
Nicuşor Dan: Este o chestiune de săptămâni, două săptămâni, trei săptămâni, până când hidrologii spun că vom avea suficientă apă pentru a porni cel puţin unul din reactoarele de la Cernavodă

Latest News

18:35

Donald Trump claims he could have won the Vietnam War in a week

18:24

King Charles III was caught in a downpour and waited in the rain to receive an umbrella at the festivities in Antigua and Barbuda

18:23

The National History Museum is entering renovation / Over 17 million exhibits will be moved

18:09

Florin Manole accuses Dragoș Pîslaru of submitting false data to the European Commission

18:08

Mojtaba Khamenei grants the Iranian government powers for negotiations with the United States

See more news

NEWS ON THE SAME TOPICS

event image
Politics
Cristian Bușoi, Secretary of State in the Ministry of Energy: "The effect of the actions on the Danube has not been sustainable. We must also be prepared for the scenario in which unit 2, for a short period of time, would not operate."
event image
Politics
Cristian Bușoi, Secretary of State in the Ministry of Energy: "Strictly from the shutdown of Cernavodă 2, we will not reach a blackout situation. People need to stay calm."
event image
Current Affairs
The Secretary of State in the Ministry of Energy, Cristian Bușoi, announces that restarting the Cernavodă Nuclear Power Plant depends on an increase in the Danube’s flow rate and the specialists’ decision / “We cannot risk the pumps being damaged”
event image
Current Affairs
Cristian Bușoi: Cernavodă Reactors to Remain Offline for at Least Ten Days
event image
Current Affairs
Interim Prime Minister Ilie Bolojan announces that the Cernavodă power plant can still operate for another four or five days under the current conditions, in which the level of the Danube continues to drop by a few centimeters.
event image
Current Affairs
The Cernavodă nuclear power plant could remain shut down in November, while costly imports could drive up Romanian consumers’ bills
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Dan Nicușor the reactors at Cernavodă

Editor’s Recommendations

main event image
Exclusive
10 hours ago
Original Content

EXCLUSIVE | November 2, 2026. Online search trends / last 24 hours

main event image
Exclusive
7 hours ago

SPECIAL Local rain does not fill the Danube: why Cernavodă remains shut down

main event image
Exclusive
8 hours ago

EXCLUSIVE The top sports topics from the past week / The Mbappé–China scandal, the Milan derby, and the surprises in the Cups

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol