search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
105 new news items in the last 24 hours
  1. Home
  2. International

NASA has begun the final tests for the Artemis 2 mission, the first with a human crew to the Moon since 1972 until now.

Gabriel Dumitrache
whatsapp
facebook
linkedin
x
copy-link copy-link
26 January 2026, 13:24
main event image
International
Foto: Shutterstock
google-preference

Always see our news on Google

NASA is approaching the launch of the Artemis 2 mission, the first with a human crew to the Moon since 1972, scheduled for February 6. The Space Launch System (SLS) rocket and the Orion capsule have been transported to Launch Pad 39B for final tests. The mission will last approximately 10 days and will include a crew of four astronauts: Reid Wiseman (commander), Victor Glover (pilot), Christina Koch, and Jeremy Hansen (mission specialist).

Before the launch, NASA will check the rocket's systems, including emergency evacuation and communications. Although February 6 is the primary date, the agency has alternative dates in February, March, and April. Artemis 2 will test all the systems necessary for future lunar missions, without landing, and will take the crew to a record altitude of 8,889 km above the Moon. After the mission, the data will be analyzed to prepare for Artemis 3, planned for 2027.

Sources

sursa imagine
G4Media
NASA începe testele finale pentru lansarea spre Lună a misiunii Artemis 2, prima cu echipaj uman după mai bine de 50 de ani. Artemis 2 va duce oamenii mai departe de Pământ ca oricând
sursa imagine
Cotidianul
NASA începe testele finale pentru lansarea spre Lună a misiunii Artemis 2
sursa imagine
Stiripesurse
Racheta misiunii Artemis 2 trece prin ultimele teste înainte de zborul spre Lună

Latest News

23:08

Nicușor Dan argues that anyone who repressed during the Revolution has no place in a high position, but Pahonțu is not in this situation.

22:38

A commercial ship caught fire in the Black Sea. Nicușor Dan: It was hit and seems to have sunk.

22:20

Nicușor Dan, after the trilateral meeting in Chișinău: Romania, the Republic of Moldova, and Ukraine will continue collaboration in the fields of infrastructure, energy, and security.

22:01

Péter Magyar: Paks operates at maximum capacity / The nuclear power plant in Romania, previously cited as an example, has been shut down for two weeks.

21:38

UEFA has conducted the draw for the main stage of the Champions League / Liverpool and Real for Chivu

See more news

NEWS ON THE SAME TOPICS

event image
IT&C knowledge
NASA has announced the crew of the Artemis 3 mission, scheduled for 2027, consisting of four astronauts. They will test the Orion spacecraft and the landing modules developed by SpaceX and Blue Origin.
event image
IT&C knowledge
NASA selects only men for the Artemis 3 crew, Jared Isaacman explains the decision
event image
International
Russia launched a mission with two Russian cosmonauts and one American astronaut to the ISS from the cosmodrome in Kazakhstan
event image
IT&C knowledge
NASA allocates 590 million dollars to the companies Astrobotic, Firefly Aerospace, and Intuitive Machines for lunar missions. The first phase of the lunar base will be completed by 2028.
event image
IT&C knowledge
The 'Aeolus' Project: NASA collaborates with Relativity Space for the exploration of the planet Mars
event image
Current Affairs
A SpaceX rocket will collide with the Moon/ The impact will provide research opportunities on the lunar composition
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
NASA Artemis moon USA

Editor’s Recommendations

main event image
Current Affairs
3 hours ago

A commercial ship caught fire in the Black Sea. Nicușor Dan: It was hit and seems to have sunk.

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol