search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
141 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Reactor 2 at Cernavodă experienced a power reduction due to the activation of a pump, but it will return to nominal power.

Emese Grancsa
whatsapp
facebook
linkedin
x
copy-link copy-link
29 November 2025, 10:11
main event image
Current Affairs
shutterstock.com
google-preference

Always see our news on Google

Nuclearelectrica, the state-owned company that manages the nuclear power plant in Cernavodă, announced a power reduction at reactor 2, caused by the activation of a feedwater pump. The company specified that the reactor will return to its nominal power after the backup pump is started and that this reduction does not affect nuclear safety, personnel, or the population, being carried out according to applicable procedures.


In the first nine months of the year, Nuclearelectrica recorded a net profit of 1.62 billion lei, an increase of 26.6%, while operating revenues increased by 22.9%, reaching 4.17 billion lei. Electricity production increased by 1%, reaching 7,383 GWh. The company also announced an investment program for 2025 worth 3.43 billion lei, aimed at strategic projects and infrastructure development.

Sources

sursa imagine
G4Media
Reducere de putere la un reactor al centralei de la Cernavodă
sursa imagine
News.ro
Nuclearelectrica - Unitatea 2 a centralei nucleare din Cernavodă, unde a avut loc o reducere de putere, a revenit la putere nominală
sursa imagine
Profit.ro
Reducere de putere la reactorul 2 al centralei nucleare din Cernavodă
sursa imagine
Economica
Unitatea 2 a CNE Cernavodă a revenit la puterea nominală după o mică avarie survenită ieri seară

Latest News

13:08

Mugur Isărescu states that Romania does not meet the necessary criteria for adopting the euro: "The country is not ready"

13:01

The BNR has revised the inflation forecast for the end of 2026 to 6.1% and estimates an inflation of 3.4% at the end of 2027.

13:01

American spending on TikTok Shop exceeded in July spending at retailers like Target and Costco

12:45

The Competition Council fined 21 companies 83.2 million lei for anti-competitive agreements in the field of seeds and plant protection products.

12:43

Dumitru 'Mitică' Marcu, former footballer of Universitatea Craiova and Steaua București, passed away at the age of 76.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Unit 2 of the Cernavodă NPP will be shut down in a controlled manner due to the low flow of the Danube.
event image
Current Affairs
The Cernavodă Nuclear Power Plant has initiated the technical procedures for the controlled shutdown of Unit 2. The Rovinari 4 energy group of the Oltenia Energy Complex will be taken out of reserve to compensate for production.
event image
Current Affairs
Unit 2 of the Cernavodă Nuclear Power Plant is operating normally under drought conditions.
event image
Current Affairs
CNE Cernavodă has decided to keep Unit 2 operational, after analyzing the operating parameters.
event image
Current Affairs
Reactor 2 of the nuclear power plant in Cernavodă can operate for four to five days due to the low flow of the Danube. Authorities are discussing measures to divert water and save energy.
event image
Current Affairs
The closure plan from Cernavodă is moving forward
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Cernavoda Nuclearelectrica Constanta

Editor’s Recommendations

main event image
Current Affairs
45 minutes ago

The nuclear power plant in Cernavodă has been shut down / The first effects of disconnecting reactor 2

Sources
imagine sursa
imagine sursa
main event image
Current Affairs
1 hour ago

The object discovered at sea in Costinești, confirmed to be a drone by the prefect of Constanța

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
main event image
Opinions
2 hours ago

Andrei Pleșu: Memories about Trabant

main event image
Exclusive
3 hours ago
Original Content

August 13, 2026. TV: What was discussed last night on the news channels

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol