search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
133 new news items in the last 24 hours
  1. Home
  2. Current Affairs

MOL conducts tests on the Adria oil pipeline to evaluate performance and transport capacity

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
10 March 2026, 16:17
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The Hungarian company MOL has announced the initiation of a series of tests on the Adria oil pipeline, aimed at evaluating its performance and sustainability under varying weather conditions and over the long term. The tests will last approximately 10 months and will analyze not only the capacity of the pipeline but also the entire logistics chain for transporting oil, including port capacity and unloading speed. Although the Slovnaft refinery in Bratislava operates at maximum capacity, the Danube refinery has limited capacity, which will affect the initial tests. Starting in 2023, the annual capacity of the pipeline has been estimated between 11 and 15 million tons, but so far, no more than 2.2 million tons have been transported. In 2027, after evaluating the tests, the operational future of the pipeline will be decided. MOL is also awaiting clarifications from the Croatian authorities regarding the transport of Russian oil exempted from sanctions.

Sources

sursa imagine
Economica
Anunţ al ungurilor de la MOL. Încep testele
sursa imagine
Profit.ro
MOL începe testele de capacitate pe conducta Adria
sursa imagine
Capital
MOL și JANAF testează capacitatea conductei Adria. Programul de evaluare va dura aproximativ zece luni

Latest News

14:43

An advertising panel collapsed onto a pole in Azuga, affecting power and telecommunications and temporarily blocking DN 1

14:41

Mauricio Pochettino, officially the new manager of Manchester United!

14:40

DIICOT seizes 111 properties and the defendants’ bank accounts in the diesel fuel tax evasion case

14:36

Zelensky announces “the largest prisoner exchange since the beginning of the war”

14:34

The Russian Ice Hockey Federation threatens Germany with damages if Russia is excluded from the 2027 World Championship

See more news

NEWS ON THE SAME TOPICS

event image
International
Kazakhstan’s oil companies are analyzing a Trans-Caspian route through Azerbaijan to reduce dependence on exports via Russia
event image
Current Affairs
Petrotel Lukoil announces a shipment of Kazakh crude oil to Constanța by November 20 to resume refinery operations
event image
EU
The Trans-Balkan Pipeline enters a new capacity regime in October, while the Energy Community expects more competitive tariffs
event image
International
Russia increases its oil exports via the Arctic route
event image
Economy
Transgaz and Kawasaki will test the large-scale transport of pure hydrogen through onshore pipelines in Romania
event image
Economy
OMV Petrom has invested €5.4 billion of the €11 billion plan through 2030
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
gas pipeline oil pipeline titei test

Editor’s Recommendations

main event image
Politics
3 hours ago

Remus Ștefureac, INSCOP director: A PNL-USR alliance could become a benchmark for 2028

main event image
International
1 hour ago

What we know so far about the global Microsoft outage. OpenAI and Anthropic affected

main event image
Exclusive
1 hour ago

ANALYSIS Nvidia licenses for China: from a donation for the White House ballroom to allegations of political influence

main event image
International
2 hours ago

First EU summit on AI overshadowed by disputes over who should represent the Union at peace negotiations for Ukraine

main event image
Opinions
Yesterday 09:38

Andrei Cornea: Forget Machiavelli!

main event image
Politics
4 hours ago

INSCOP Director Remus Ștefureac announces Nicușor Dan’s level of trust in opinion polls: “Such a figure has nothing to do with reality”

Sources
imagine sursa
main event image
Exclusive
3 hours ago

EXCLUSIV E-TRENDS by NewsVibe. The ranking of trending economic topics over the past week / Jensen Huang and the scandal at Nvidia in the spotlight

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol