search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
163 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Hidroelectrica starts the controlled emptying of the Vidraru reservoir for the refurbishment, with an estimated completion on February 28, 2026.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
31 July 2025, 15:59
main event image
Current Affairs
sursa foto: Giulio Andreini/UCG/Universal Images Group / Universal images group / Profimedia
google-preference

Always see our news on Google

The process of controlled emptying of the Vidraru reservoir, the first such operation since 1974, is essential for the evaluation and modernization of the dam after almost 50 years of operation. The CEO of Hidroelectrica, Karoly Borbely, emphasized that this stage will ensure a new lease of life for the production capacities, using modern technology to increase energy efficiency. The emptying will take place between August 1, 2025 and February 28, 2026, through controlled turbination and discharge into the Argeș River.

Sources

sursa imagine
psnews.ro
Hidroelectrica începe golirea lacului Vidraru, pentru prima dată după anul 1974
sursa imagine
Profit.ro
VIDEO Hidroelectrica începe golirea acumulării Vidraru, prima după 1974. Pregătiri pentru retehnologizarea hidrocentralei, investiție de peste 200 de milioane de euro
sursa imagine
Digi24
Hidroelectrica începe golirea lacului Vidraru, pentru prima dată după anul 1974
sursa imagine
Ziarul Financiar
Hidroelectrica începe vineri golirea controlată a lacului de acumulare Vidraru, parte a proiectului de 188 mil.euro de retehnologicare a barajului

Latest News

22:09

The hacker who attacked Rockstar, Uber, and Revolut and stole images from GTA 6 has been sentenced to seven years in prison

21:42

Friedrich Merz: The war with Russia could have been avoided if Ukraine had been admitted to NATO in 2008

21:38

A Romanian man was found dead in a garage in Italy / Initial checks indicate the possibility of suicide

21:35

Toronto police arrested eight Romanians accused of stealing jewelry from elderly people by distracting them and, in some cases, using force

21:28

Commission proposes excluding around 60 Russian banks from SWIFT

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Apele Române is temporarily increasing flow rates to maintain the level required to cool the Cernavodă nuclear power plant
event image
Current Affairs
Cernavodă power plant remains shut down / Low Danube water flow delays reactor restart
event image
Economy
Hidroelectrica is preparing the approval of the construction of a floating photovoltaic panel system on the Olt River, an investment of 1.4 billion lei
event image
Economy
Hidroelectrica Raises Electricity Prices / How Much Household Customers’ Bills Will Increase
event image
Environment
The Danube reaches record-low flows, and the reactors at Cernavodă cannot be restarted due to a lack of water for cooling
event image
Current Affairs
The Cernavodă nuclear power plant remains shut down / The reactors cannot be restarted because of the Danube’s low flow rate
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hidroelectrica Vidraru hydropower plant retehnologizare

Editor’s Recommendations

main event image
Politics
2 hours ago

AUR Report on the Annulment of the 2024 Elections: “The Only Interferences Were Those of the Romanian State Institutions”

Sources
imagine sursa
imagine sursa
main event image
Exclusive
5 hours ago

SPECIAL Informat.ro / The top international politics topics of the past week. From Shenzhen to the eastern flank, maximum pressure on Europe’s security

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol