search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
129 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Eight bids have been submitted for the final section of the Unirii A8 Highway, which will connect Romania with the Republic of Moldova. The project includes a 5 km segment in Moldova.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
26 January 2026, 15:23
main event image
Current Affairs
Foto: Pixabay
google-preference

Always see our news on Google

Eight bids have been submitted for the design and execution of the final section of the Unirii A8 Highway, which connects Târgu Neamț to Iași and Ungheni, facilitating road connectivity with the Republic of Moldova. The project includes the continuation of the highway on Moldovan territory, through a connection with the Flower Bridge over the Prut.


Among the bidders are four associations and four companies, including leaders such as Danlin XXL and Far Foundation. The section is 15.5 km long, with an estimated cost of 4.7 billion lei, financed through the Security Action for Europe (SAFE) Program. The contract includes the construction of 14 bridges, two tunnels, and two road junctions, with a completion duration of 46 months, focusing on the rapid completion of the segment in Moldova.

Sources

sursa imagine
Digi24
Opt oferte au fost depuse pentru contruirea ultimului tronson al Autostrăzii Unirii A8, cu extindere în Republica Moldova
sursa imagine
psnews.ro
Opt oferte primite pentru construirea ultimului tronson din autostrada Unirii și a 5 km de autostradă în R. Moldova
sursa imagine
Mediafax
Opt oferte pentru ultimul tronson al Autostrăzii „Unirii” între Iași și Ungheni, inclusiv 5 km în Republica Moldova
sursa imagine
Economica
Autostrada Unirii A8: Constructori din România, Ucraina, Grecia, Bulgaria, Turcia, Italia și Spania au depus oferte pentru ultimii kilometri

Latest News

22:54

Iulia Navalnaya urges Russians to vote for Yabloko: the September elections, a legal referendum against the war

22:39

The air forces of Bulgaria, Romania, and Spain have signed a trilateral agreement for air policing operations within NATO.

22:30

The government has approved the 'Diaspora Invests at Home' program, which offers grants of up to 200,000 euros to Romanians from the Diaspora for businesses in Romania.

22:22

The crisis in Ceuta unites the Spanish extremes: Sumar and Vox demand the exclusion of Morocco from the 2030 World Cup.

22:14

At the County Emergency Hospital in Miercurea Ciuc, the first two prostate cancer surgeries were performed with the help of the Da Vinci robotic system.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Ilie Bolojan announced the signing of the SAFE contract for section 4 of the "Union" A8 Highway, which will connect Romania to the Republic of Moldova.
event image
Current Affairs
The CNIR issued the order to suspend the design of sections 1 and 3 of the Unirii A8 Highway. The total length will be 45 km.
event image
Current Affairs
CNIR signed a contract with FCC Construccion for section 3 Lețcani - DN 24 of the A8 Highway, worth 3.93 billion lei
event image
Current Affairs
The Secretary of State in the Ministry of Transport announced the issuance of the construction permit for the first lot of the mountain sector of the Unirii Highway A8
event image
Current Affairs
CNAIR announces significant progress in the construction of the Moldova Motorway (A7)
event image
Current Affairs
Horațiu Cosma announced that the physical stage of the first lot of the Unirii A8 Highway has reached 50%
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
offers Construction trunk highway A8 Republic of Moldova

Editor’s Recommendations

main event image
Opinions
Yesterday 12:44
Editorials and opinions

The open society and its narrative enemies

main event image
Opinions
Yesterday 08:52

Andrei Pleșu: 1871-2019 – immortal Romanian traditions

main event image
Opinions
Yesterday 11:26

Romania closed its coal on paper and built gas plants from words

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol