search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP survey
    • Podcast
    • Diaspora
    • Moldova
    • Politics
    • Economy
    • News
    • International
    • Sport
    • Health
    • Education
    • Science IT&C
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
  1. Home
  2. News
112 new news items in the last 24 hours
23 May 12:53

The Focșani - Brăila Express Road project has been technically endorsed and will be submitted for approval to the Interministerial Council.

training2
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
News
Foto Ministerul Transporturilor
The Focșani - Brăila Express Road will be 73.52 km long and worth an estimated 5.5 billion lei. The project also includes the planting of 155 hectares of forest. The road is part of plans to develop infrastructure in the Brăila-Galati area, which will become an important logistical hub for the reconstruction of Ukraine.

Sources

sursa imagine
Capital
Un nou drum de mare viteză în România. Sorin Grindeanu a făcut anunțul
Economica
Drumul Expres Brăila – Focșani, avizat joi de Ministerul Transporturilor. Va avea 155 de hectare de perdele forestiere
sursa imagine
Antena3
Sorin Grindeanu anunţă avizarea proiectului unui nou drum expres în România
sursa imagine
Gandul
A fost AVIZAT proiectul drumului expres Focşani - Brăila/ Grindeanu: Drum de peste 73 de km, investiţie cu o valoare estimată de 5,5 miliarde de lei
sursa imagine
Economedia
Ministerul Transporturilor a aprobat indicatorii pentru Drumul Expres Focșani-Brăila/Autostrada Moldovei, legătură la Podul Brăila și la viitorul Drum Tulcea-Constanța
sursa imagine
Profit.ro
FOTO Autoritățile au lansat operațiunile pentru un nou Drum Expres
sursa imagine
Economica
Drumul Expres Brăila - Focșani, avizat joi de Ministerul Transporturilor. Va avea 155 de hectare de perdele forestiere - Economica.net
sursa imagine
News.ro
Sorin Grindeanu: Am avizat astăzi proiectul Drumului Expres Focşani - Brăila / Drum de peste 73 de kilometri, investiţie cu o valoare estimată de 5,5 miliarde de lei
sursa imagine
B1TV
Proiectul Drumului Expres Focșani-Brăila a fost avizat astăzi de Ministerul Transporturilor - B1TV.ro

ȘTIRI PE ACELEAȘI SUBIECTE

event image
News
The first procurement procedure for the FAST DANUBE 2 project has been launched, which will allow the navigation of vessels on the Danube almost all year round.
event image
News
The works to modernize the Loviștei Road (DJ 703H) have started, with an investment of 35 million euro, benefiting the localities in the area.
event image
News
Work on the Focșani-Bacău section of the Moldova highway is advanced, with 80% completion on the first two sections and 60% on the last, promising to open traffic until Adjud.
event image
News
The Minister of Transport, Ciprian Șerban, announced the designation of the winner for the feasibility study of the Bucharest–Giurgiu highway, the contract being awarded to the association between Activ Proiectare Infrastructură and an engineering firm from Turkey.
event image
News
CNAIR announces a progress of 57% on the Suplacu de Barcău – Chiribiș section of the Transylvania highway, with 540 workers and 305 active machines.
event image
News
The City Hall and Brasov County Council have signed an agreement for the Metropolitan Train, estimated at 238 million euro, with a feasibility study as the first step.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Sorin Grindeanu express road focsani braila reconstruction Ukraine

Informat Moldova

main event image
Moldova
5 hours before

Over 5,802 families in Moldova will be able to replace old appliances with new, energy-efficient ones, during the period of September 12-29, with the help of the EcoVoucher program.

Sources
imagine sursa

Informat Diaspora

main event image
Diaspora
4 hours before

The German bank Postbank will apply new fees for cash deposits and withdrawals, and customers are advised to be attentive to the announced changes.

Sources
imagine sursa

Editor’s Recommendations

main event image
INSCOP survey
6 hours before

BAROMETRUL Informat.ro - INSCOP Research - Economic interventionism and cultural conservatism | 61.3% of Romanians believe that the state should intervene more in the economy

main event image
News
6 hours before

The Russian Embassy in Bucharest has contested the protest of the Romanian authorities regarding the entry of a Russian drone into Romanian airspace, claiming that the drone would be a provocation from Ukraine.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+6
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol