search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP survey
    • Podcast
    • Diaspora
    • Moldova
    • Politics
    • Economy
    • News
    • International
    • Sport
    • Health
    • Education
    • Science IT&C
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
  1. Home
  2. Education
44 new news items in the last 24 hours
22 January 12:53

The City Hall of Sector 4 has signed the contract for the reconstruction of the Unirii Floor, a project that will last 33 months and will be carried out in stages.

Ioana Licu
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
News
foto: pinterest
The Union Floor, an almost 100-year-old concrete construction, will be completely rebuilt, the project being financed by the Romanian Government. Nine months are allocated for the technical design and the remaining 24 months for the actual execution of the works. The works needed to strengthen the Union Bridge will also be designed.

Sources

sursa imagine
Adevarul
Începe reconstrucția totală a Planșeului Unirii din centrul Capitalei. Ce se întâmplă cu Pasajul Unirii
sursa imagine
Gandul
Imaginile dezastrului de sub Piața Unirii. Când începe consolidarea Planșeului și ce presupun lucrările
Newmoney
Începe reconstrucția planșeului de la Piața Unirii
sursa imagine
Hot News
Primăria Sectorului 4 a semnat contractul pentru lucrările de reabilitare a planșeului de la Piața Unirii / Lucrările vor începe în 2025
sursa imagine
Profit.ro
București - Începe reconstrucția Planșeului Unirii. Cât durează lucrările. Piața Unirii, în pericol de prăbușire
sursa imagine
Digi24
Începe reconstrucția Planșeului Unirii, în pericol de prăbușire. Toată Piața Unirii va fi decopertată, proiectul va dura aproape 3 ani
sursa imagine
Ziare.com
Șantier în centrul Capitalei. Începe reconstruirea totală a Planşeului Unirii
sursa imagine
Economedia
S-a semnat contractul pentru reconstruirea planșeului de beton de la Piața Unirii și consolidarea Pasajului subteran Unirii. Primarul Daniel Băluță : lucrările încep în 2025 și costă 1,1 miliarde lei/Circulația nu se închide complet
sursa imagine
B365
BREAKING | Toată Piața Unirii va fi decopertată, fântânile se vor demonta. Planșeul și pasajul din inima Bucureștiului sunt într-o periculoasă stare de degradare * Știri București
sursa imagine
Stirile ProTV
Când încep lucrările la planșeul din Piața Unirii. Nivelul de degradare este la 4 din 5. "Trebuie refăcut pe de-a-ntregul

ȘTIRI PE ACELEAȘI SUBIECTE

event image
News
Archaeological discoveries during the works at Unirii Square
event image
News
The Mayor of Sector 4, Daniel Băluță, stated that the status of the works on the road overpass at Apărătorii Patriei is advanced, estimating their completion by the end of 2026.
event image
News
Traffic on Splaiul Independenței has resumed, and the works on the Unirii square continue without disrupting traffic, according to Mayor Daniel Băluță.
event image
News
Interim Mayor Stelian Bujduveanu announces the opening of two construction sites for the modernization of 4.1 km of heating pipes, financed 85% from non-reimbursable funds.
event image
News
The Ministry of Transport has authorized the modernization of the North Station, with a value of almost 538 million lei and a construction duration of 46 months.
event image
News
The City Hall will ask the Government to transfer the Esplanada land for an urban regeneration project, including various public functions.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
planseul unirii reconstruction passage

Informat Moldova

main event image
Moldova
2 hours before

A week before the elections in Moldova, Ukrainian President Volodymyr Zelensky imposed symbolic sanctions against pro-Russian politicians in the neighboring country.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Moldova
Friday 12:40

The possibility of suspending Moldova's Economic Growth Plan of 1.9 billion euros could severely affect the economy and the country's European integration.

Sources
imagine sursa

Editor’s Recommendations

main event image
News
yesterday 18:50

The Ministry of Foreign Affairs informs Romanians about a cyber attack that affected airports in London, Berlin, and Brussels, recommending checking flight statuses.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image Play button
Friday 11:57
Podcast

Podcast: The Mid-Career Crisis – discrimination, reinvention, and the courage of professionals 40+

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol