search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
138 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Energy Minister Sebastian Burduja announces the completion of the Iernut gas-fired power plant this year, with the aim of revitalizing local industries and increasing gas production

Delia Niculescu
whatsapp
facebook
linkedin
x
copy-link copy-link
22 May 2025, 12:07
main event image
Current Affairs
foto: Lucian Alecu / Alamy / Profimedia
google-preference

Always see our news on Google

The Iernut gas-fired power plant, 97% completed, could be fully operational this year, with a total capacity of 1,750 megawatts. Burduja underlines its importance for the revitalization of the fertilizer, agricultural and pharmaceutical industries, as well as for increasing gas production, in particular through the Neptun Deep project. Romania also aims to develop offshore wind energy and a submarine HVDC cable to connect the Caspian Sea to the Black Sea, thus strengthening regional energy security.

Sources

sursa imagine
Financial Intelligence
Burduja: Centrala de la lernut ar putea să fie finalizată anul acesta; mai avem 3% de completat
sursa imagine
Economica
Centrala pe gaze de la Iernut – Prima turbină ar putea fi gata anul acesta. Va fi cea mai mare unitate de acest fel din regiune

Latest News

13:54

Marine drone destroyed near Neptun Deep / MapN clarifications

13:52

A man and a woman are accused of stealing jewelry and gold coins worth 150,000 lei from the home of a 70-year-old woman.

13:37

Romeo Lungu, following the decision of Mayor Constantin Toma to run as an independent: "2028 will be the moment when this election will be tested by vote"

13:24

Marian Godină announces that he has resigned from the Romanian Police

13:13

Daniel Buda, PNL leader, categorically excludes collaboration with PSD: "We will not support a government controlled by PSD"

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Ilie Bolojan: The thermal power plant in Iernut must be completed by the end of the year.
event image
Politics
Former Energy Minister Sebastian Burduja has a message for those who "say loudly that Romania has no storage": Romanian batteries, not Bulgarian, provide about 650 megawatts to the system, which is almost as much as Reactor 2 at Cernavodă.
event image
Economy
Interim Prime Minister Ilie Bolojan announced that Romania will become the largest gas producer in the European Union due to the exploitation of gas from the Black Sea.
event image
Economy
The biogas station in Pașcani, completed after two years of waiting
event image
Current Affairs
The Nehoiașu II Hydroelectric Power Plant could be put into operation in 2029, after obtaining the environmental agreement.
event image
Current Affairs
Bogdan Ivan announces that the energy group number 4 at the Rovinari Power Plant has started to produce energy for the National Energy System.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Sebastian Burduja finaliz gas power plant local industries production increase

Editor’s Recommendations

main event image
Current Affairs
53 minutes ago
Breaking News

A naval drone, destroyed in the Neptun Deep area by a Romanian F-16

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+9
main event image
Current Affairs
3 hours ago

Turceni power plant, shut down due to a technical malfunction

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+6
main event image
Exclusive
3 hours ago
Original Content

August 20, 2026. TV: What was discussed last night on the news channels

main event image
Politics
6 hours ago

President Nicușor Dan has convened the leaders of PSD, PNL, USR, and UDMR for negotiations on the Salary Law. The meeting takes place today at 14:00.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
3 hours ago

The ANM announces a heat wave in Romania between August 20 and 24, with maximum temperatures of 33-40 degrees. An orange code is issued for several regions.

Sources
imagine sursa
imagine sursa
main event image
Opinions
3 hours ago

Andrei Pleșu: About public speaking

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol