search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP survey
    • Podcast
    • Diaspora
    • Moldova
    • Politics
    • Economy
    • News
    • International
    • Sport
    • Health
    • Education
    • Science IT&C
    • Arts & Lifestyle
    • Opinions
  1. Home
  2. News
47 new news items in the last 24 hours
30 June 16:04

Rail traffic will be closed between June 30 and July 29 on the Balș-Robănești route due to consolidation works on the embankment.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
News
sursa foto: unsplash.com
CFR SA has announced that between June 30 and July 29, rail traffic will be completely suspended between Balș and Robănești stations, for earthworks to consolidate the embankment on the CF 101 Pitești-Craiova line. The constructor will provide means of transportation for passengers. The works, estimated at 6.362 million lei, will include improvements to the railway infrastructure and protection of the embankment against rainwater. The total duration of the works is 3 months, with one month of total closure of traffic.

Sources

sursa imagine
psnews.ro
Circulație feroviară închisă complet din cauza lucrărilor de renovare. Anunțul CFR
sursa imagine
DCNews
Circulația feroviară va fi închisă total în perioada 30 iunie-29 iulie pe o bucată de pe linia CF Pitești-Craiova

ȘTIRI PE ACELEAȘI SUBIECTE

event image
News
The National Company CFR SA has signed a contract with PORR Construct SRL for the design and execution of works on lot 5 Băile Herculane-Poarta, part of the rehabilitation of the railway line Craiova – Drobeta Turnu Severin – Caransebeș.
event image
News
CFR Călători will gradually suspend dozens of train services from September 1 and October 1, 2025, due to debts of 41 million lei to CFR Infrastructură.
event image
News
Trains on the Fetești - Cernavodă route are delayed between 64 and 200 minutes due to infrastructure problems. Passengers can request refunds.
event image
News
Rail traffic on the Medgidia - Mircea Voda route is stopped due to a vegetation fire, and trains have been de-energized for safety reasons.
event image
News
CFR Călători trains will be suspended if they do not pay the 41 million lei due to the Infrastructure Use Tariff within 4 days.
event image
News
CFR SA will install sound-absorbing panels in Constanța and Chitila, with an investment of almost 11 million lei, to reduce rail noise.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Cfr temporary closure circulation terasament

Editor’s Recommendations

main event image
Exclusive
yesterday 09:05
Exclusive Content

IT News Review by Control F5 Software: Chatbots can be manipulated through flattery and pressure

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP survey
  • Podcast
  • Diaspora
  • Moldova
  • Politics
  • Economy
  • News
  • International
  • Sport
  • Health
  • Education
  • Science IT&C
  • Arts & Lifestyle
  • Opinions
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol